Loop 1604 – North Central San Antonio
- Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
- Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for asphalt paving.
- Saturday, May 22 until Monday, May 24. Weekend continuous 3 a.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
- Saturday, May 22 until Monday, May 24. Weekend continuous 3 a.m. until 5
a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway
for asphalt paving.
Loop 1604 – Far East San Antonio/Bexar County
- Saturday, May 22. 5 a.m. to 12 p.m. Full closure of mainlanes, in both
directions, at I-10 intersection for bridge work. DETOUR: Traffic will be
routed through I-10 frontage roads.
Loop 1604 – North West San Antonio/Bexar
County
- Current until Friday, May 21. Weekday Nights 9 p.m. to 5 a.m. Eastbound entrance ramp from La Cantera Parkway closed for barrier setting and re-striping. DETOUR: Traffic will continue on eastbound Loop 1604 frontage road and enter mainlanes after the I-10 intersection.
- Current until Friday, May 21. Weekday Nights. 9 p.m. to 5 a.m. Eastbound exit ramp to Vance Jackson Rd. closed for barrier setting and re-striping. DETOUR: Traffic will exit at La Cantera Parkway and continue through the La Cantera Parkway intersection.
- Sunday, May 23 until Monday, June 7. Weeknights 9 p.m. to 5 a.m. Alternating eastbound single mainlane closure, including the entrance ramp from SH 16 and exit ramp to Hausman Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use Kyle Seal Parkway entrance ramp and the exit ramp before Bandera Rd.
- Sunday, May 23 until Monday, June 7. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use the entrance ramp after Babcock Rd. and the exit ramp before Hausman Rd.
- Sunday, May 23 until Monday, June 7. Weeknights 9 p.m. to 5 a.m.
Alternating eastbound mainlane closure, including the exit ramp to La Cantera
Parkway/Chase Hill, for restriping and barrier setting. DETOUR: Traffic will be
directed to exit before Babcock Rd.
US 281 – North Central San Antonio/Bexar
County
- Friday, May 14 until Friday, May 21. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. at US 281 intersection for drainage installation.
- Saturday, May 15. 7 a.m. to 5 p.m. Single southbound lane closure from Borgfeld Rd. to Bulverde Rd. for demolition.
- Saturday, May 15. 7 a.m. to 5 p.m. Single southbound lane closure at Estate Gate Dr. for sidewalk improvements.
- Monday, May 17 until Wednesday, May 19. 9 p.m. to 5 a.m. Single southbound lane closure at Borgfeld Rd. for traffic signal work.
- Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, May 15 until Sunday, May 16. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Monday, May 17 until Friday, May 21. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left onto Stone Oak Parkway and turn left onto the southbound US 281 frontage road.
- Monday, May 17 until Friday, May 21. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the southbound US 281 frontage road.
- Monday, May 17 until Friday, May 21. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left on Stone Oak Parkway and turn left onto the northbound US 281 frontage road.
- Monday, May 17 until Friday, May 21. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the northbound US 281 frontage Road.
- Monday, May 17 until Friday, May 21. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure of the southbound US 281 flyover ramp to eastbound Loop 1604 for painting.
- Monday, May 17 until Friday, May 21. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for sign installation.
- Monday, May 17 until Friday, May 21. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for sign installation.
- Saturday, May 22 until Monday, May 24. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, May 22 until Monday, May 24. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
Stone Oak Parkway – North Central San Antonio
- Friday, May 7 until Saturday, May 8. Weekend overnight 9 p.m. until 5 p.m. Alternating eastbound crossing closure at the US 281 intersection for a traffic switch.
- Friday, May 7 until Saturday, May 8. Weekend overnight 9 p.m. until 5
p.m. Alternating westbound crossing closure at the US 281 intersection for a
traffic switch.
I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County
- Friday, May 21 – 9 p.m. to Monday, May 24 – 5 a.m. Full closure of
mainlanes from SH 46 to Scenic Loop Rd. for demolition of US 87 bridge. Lanes
under Scenic Loop Rd. bridge will also be closed. DETOUR: Traffic will be
directed to frontage roads.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
- Saturday, May 15. 5 a.m. to 9 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for barrier movement asphalt operations.
- Sunday, May 16 until Monday, May 17. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier movement and striping operations.
- Monday, May 17 until Tuesday, May 18. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier movement and striping operations.
- Monday, May 17 until Tuesday, May 18. 8:30 p.m. to 5:30 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for asphalt operations.
- Monday, May 17 until Friday, May 21. 7 p.m. to 5 a.m. Left lane closure, in both directions, from Loop 1604 to Saltrillo Creek for material hauling.
- Tuesday, May 18 until Wednesday, May 19. 8:30 p.m. to 5:30 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for asphalt operations.
- Tuesday, May 18 until Wednesday, May 19. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier movement and restriping.
- Wednesday, May 19 until Thursday, May 20. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier movement and restriping.
- Wednesday, May 19 until Thursday, May 20. 8;30 p.m. to 5:30 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for asphalt operations.
- Wednesday, May 19 until Thursday, May 20. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for asphalt operations.
- Thursday, May 20 until Friday, May 21. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from Pfeil Rd. to FM 1518 for barrier movement and restriping.
- Saturday, May 22. 5 a.m. to 9 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd. for barrier movement and asphalt operations.
- Saturday, May 22. 5 a.m. to 9 p.m. Full closure of westbound mainlanes from FM 1516 to Weichold Rd. for bridge work.
- Saturday, May 22. 5 a.m. to 9 p.m. Single eastbound mainlane closure from FM 1516 to Weichold Rd. for bridge work.
- Current until Thursday, July 1. Westbound frontage road left lane closed between Foster Road and Rosillo Creek from noon to 5 p.m. for embankment work. Westbound Ackerman Road exit also closed from noon to 5 p.m. DETOUR: Westbound traffic wanting to exit to Ackerman may use Foster Road exit.
- Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further notice. Eastbound entrance ramp from Foster Road
closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.
I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County
- Current until Saturday, May 22. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Lane to Parkway intersection for work on retaining wall.
- Sunday, May 16 until Friday, May 21. Nightly 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from Schertz Parkway to Hubertus Rd. for overhead sign replacement.
- Sunday, May 16 until Friday, May 21. Double southbound mainlane closure from Schwab Rd. to FM 1103 for milling and overlay work.
- Monday, May 17 until Saturday, May 22. 9 a.m. to 5:30 p.m. Single southbound lane closure on frontage road from Hubertus Rd. to FM 2252 for miscellaneous work.
- Monday, May 17 until Saturday, May 22. 9 a.m. to 5:30 p.m. Single northbound lane closure on frontage road from FM 2252 to Hubertus Rd. for material haul-off.
- Monday, May 17 until Saturday, May 22. 9 a.m. to 5:30 p.m. Single southbound lane closure on frontage road from Hubertus Rd. to FM 2252 for material haul-off.
I-410 – West
San Antonio
- Current until Monday, May 17. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
- Current until Monday, May 17. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
- Current until Monday, May 17. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
- Monday, May 17 until Monday, May 24. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
- Monday, May 17 until Monday, May 24. Nightly 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to Marbach Rd. for bridge work. DETOUR: Traffic will be directed to frontage roads.
- Monday, May 17 until Monday, May 24. Nightly 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
- Monday, May 17 until Monday, May 24. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
- Monday, May 17 until Monday, May 24. 9 a.m. to 3 p.m. Single lane closure on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
SH 151 – West
San Antonio
- Current until Monday, May 17. Nightly 8 p.m. to 5 a.m. Full closure of westbound frontage road until Loop 410 to bridge rail demolition.
- Current until Monday, May 17. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
- Monday, May 17 until Monday, May 24. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
- Monday, May 17 until Monday, May 24. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
- Monday, May 17 until Monday, May 24. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
FM 471 –
Culebra Road
- Current until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound
lane closure from Mountain View to Les Harrison Dr. for sidewalk improvements.
SH 16 –
Bandera Road
- Monday, May 17 until Friday, May 28. 9 a.m. to 4 p.m. Single right lane
closures, in both directions, from N.W. Loop 410 to Braun Rd. for sidewalk and
driveway improvements.
Alamo Ranch
Parkway
- Monday, May 17 until Friday, May 21. 9 a.m. to 3 p.m. Single westbound mainlane closure from Loop 1604 to Lone Star Parkway for bridge construction.
- Monday, May 24 until Friday, May 28. 9 a.m. to 3 p.m. Single westbound
mainlane closure from Loop 1604 to Lone Star Parkway for bridge
construction.
PA 1502 – Wurzbach
Parkway
- Friday, May 14 until Saturday, May 15. 9 p.m. to 5 a.m. Single westbound lane closure at N.W. Military Hwy intersection for striping and barrier work.
- City of San Antonio project. Friday, May 21 – 9 p.m. to Monday, May 24 – 5 a.m. Full lane closures, in
both directions, from N.W. Military Highway to Blanco Rd. for work on bridge
deck.
FM 1535 – N.W.
Military Highway
- Friday, May 14 until Saturday, May 15. 9 p.m. to 5 a.m. Single northbound
lane closure at Wurzbach Parkway for striping and barrier work.
- Sunday, May 16 until Monday, May 17. 9 p.m. to 5 a.m. Single lane closures, in both directions, at Wurzbach Parkway for striping and barrier work.
Loop 13 –
Military Drive
- Current until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound
lane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements.
FM 1976 –
Walzem Road/Gibbs Sprawl Road
- Current until Friday, May 21. 8 a.m. to 5 p.m. Alternating northbound lane closures from Toepperwein Rd. to Hilltop Rd. for paving operations.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
I-37 – Atascosa
County
- Saturday, May 15 until Tuesday, May 25. Daily 7 a.m. to 8 p.m. Single mainlane closures, in both directions, from mile marker 105 to mile marker 111 for paving operations.