Loop 1604 – Far East San Antonio/Bexar County
- Tuesday, June 1 until
Wednesday, June 2. 9 p.m. to 5 a.m. Full closure of mainlanes, in both
directions, at I-10 for bridge work.
Loop 1604
– South San Antonio/Bexar County
- Tuesday, June 1 until Wednesday, June 4. 8 a.m. to 6 p.m. Single mainlane closure, in both directions, from Curran Rd. to Morin Rd. for road improvements.
Loop 1604
– North West San Antonio/Bexar County
- Current until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound single mainlane closure, including the entrance ramp from SH 16 and exit ramp to Hausman Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use Kyle Seal Parkway entrance ramp and the exit ramp before Bandera Rd.
- Current until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use the entrance ramp after Babcock Rd. and the exit ramp before Hausman Rd.
- Current until Friday,
June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure,
including the exit ramp to La Cantera Parkway/Chase Hill, for restriping and
barrier setting. DETOUR: Traffic will be directed to exit before Babcock Rd.
US 281 –
North Central San Antonio/Bexar County
- Tuesday, June 1 until Friday, June 4. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to Basse Rd. for replacement of overhead signs.
- Tuesday, June 1 until Friday, June 4. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left onto Stone Oak Parkway and turn left onto the southbound US 281 frontage road.
- Tuesday, June 1 until Friday, June 4. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the southbound US 281 frontage road.
- Tuesday, June 1 until Friday, June 4. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left on Stone Oak Parkway and turn left onto the northbound US 281 frontage road.
- Tuesday, June 1 until Friday, June 4. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the northbound US 281 frontage road.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure of the southbound US 281 flyover ramp to eastbound Loop 1604 for painting. DETOUR: Use the US 281 frontage road to access eastbound Loop 1604.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure of the southbound US 281 flyover ramp to westbound Loop 1604 for painting. DETOUR: Use the US 281 frontage road to access westbound Loop 1604.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for asphalt paving.
- Tuesday, June 1 until Friday, June 4. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for asphalt paving.
- Saturday, June 5 until Monday, June 7. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, June 5 until Monday, June 7. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Saturday, June 5 until Monday, June 7. Weekend continuous 3 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for asphalt paving.
- Saturday, June 5 until Monday, June 7. Weekend continuous 3 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for asphalt paving.
I-10 – North West San
Antonio/Bexar County/Kendall County/Kerr County
- Tuesday, June 1 until Wednesday, June 2. 9 p.m. to 5 a.m. Single eastbound mainlane closure at Loop 1604 for asphalt work.
- Tuesday, June 1 until Wednesday, June 2. 9 p.m. to 5 a.m. Single westbound mainlane closure at Worth Parkway for asphalt work.
- Wednesday, June 1 until Thursday, June 3. 9 p.m. to 5 a.m. Single westbound mainlane closure at Loop 1604 for asphalt work.
- Tuesday, June 1 until Wednesday, June 2. 9 p.m. to 5 a.m. Single southbound lane closure at Loop 1604 for asphalt work.
- Tuesday, June 1 until Wednesday, June 2. 9 p.m. to 5 a.m. Single northbound lane closure at Loop 1604 for asphalt work.
- Wednesday, June 2 until Thursday, June 3. 9 p.m. to 5 a.m. Single northbound lane closure at Loop 1604 for asphalt work.
- Friday, June 11 – 9 p.m.
to Monday, June 14 – 5 a.m. Full closure of mainlanes from SH 46 to Scenic Loop
Rd. for demolition of US 87 bridge. Lanes under Scenic Loop Rd. bridge will
also be closed. DETOUR: Traffic will be directed to frontage roads.
I-10 – Far East San Antonio/Bexar
County/Seguin/Guadalupe County
- Tuesday, June 1 from 9 p.m. to 5 a.m. Wednesday, June 2. Full northbound and southbound Loop 1604 closure at I-10 intersection for overpass work. Detour:
- Northbound traffic can take I-10 eastbound frontage road to Pfeil Rd and come back on I-10 westbound frontage road.
- Southbound traffic can take I-10 westbound frontage road to FM 1516 and come back on I-10 eastbound frontage road.
- Tuesday, June 1 to Friday, June 4 from 9 p.m. to 5 a.m. EACH NIGHT. Full westbound mainlane closure between FM 1516 and Weichold Road/Scenic Lake Drive to set beams at Loop 1604. Detour: Westbound traffic will exit at Loop 1604 and re-enter westbound I-10 at next entrance ramp.
- Tuesday, June 1 to Friday, June 4 from 9 p.m. to 5 a.m. EACH NIGHT. Eastbound left lane closed between FM 1516 and Weichold Road/Scenic Lake Drive to set beams at Loop 1604.
- Thursday, June 10 until Thursday, June 24. Eastbound entrance ramp from FM 1518 closed for roadway improvements.
- Current until Thursday, July 1. Westbound frontage road left lane closed between Foster Road and Rosillo Creek from noon to 5 p.m. for embankment work. Westbound Ackerman Road exit also closed from noon to 5 p.m. DETOUR: Westbound traffic wanting to exit to Ackerman may use Foster Road exit.
- Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further
notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next
entrance ramp east of Woodlake Parkway.
I-35 – Central
San Antonio/Northeast San Antonio/New Braunfels/Comal County
- Current until Saturday, May 29. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
- Current until Saturday, May 29. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1003 to FM 2252 for material haul-off.
- Tuesday, June 1 until Saturday, June 5. Double mainlane closures, in both directions, from Watson Ln. to Parkway for retaining wall work.
- Tuesday, June 1 until Saturday, June 5. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
- Tuesday, June 1 until Saturday, June 5. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252
- Tuesday, June 1 until Wednesday, June 2. 9 p.m. to 5 a.m. Alternating southbound mainlane closures from FM 306 to Business 35 for striping operations.
- Tuesday, June 1 until Friday, June 4. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to FM 1103 for milling and overlay work.
- Wednesday, June 2 until Thursday, June 3. 9 p.m. to 5 a.m. Single southbound mainlane closure from FM 306 to Business 35 for barrier setting.
- Friday, June 4. 8:30 a.m. to 4 p.m. Single lane closure on southbound
frontage road from FM 306 to Business 35 for barrier setting.
I-410 – West San Antonio
- Current until Monday, May 31. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
- Current until Monday, May 31. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
- Current until Monday, May 31. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
- Current until Monday, May 31. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
- Tuesday, June 1 until Monday, June 7. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
- Tuesday, June 1 until Monday, June 7. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
- Tuesday, June 1 until Monday, June 7. 8 p.m. to 5 a.m. Full closure of intersection at Culebra Rd. for bridge work.
- Friday, June 4 until Saturday, June 5. 8 p.m. to 3 p.m. Full closure of southbound frontage road from SH 151 to Waters Edge Dr. for bridge work.
- Tuesday, June 1 until Monday, June 7. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
- Tuesday, June 1 until Monday, June 7. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway.
SH 151 – West San Antonio
- Current until Monday, May 31. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
- Current until Monday, May 31. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
- Current until Monday, May 31. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
- Current until Monday, May 31. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 interchange for bridge work.
- Tuesday, June 1 until Monday, June 7. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
- Tuesday, June 1 until Monday, June 7. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
- Tuesday, June 1 until Monday, June 7. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
PA 1502 – Wurzbach Parkway
- City of San
Antonio Project. Tuesday, June 1 until
Wednesday, June 2. 8 p.m. to 6 a.m. Full closure of eastbound lanes from N. W.
Military Dr. to Blanco Rd. for bridge deck work.
- City of San
Antonio Project. Thursday, June 3 until
Friday, June 4. 8 p.m. to 6 a.m. Full closure of westbound lanes from N.W.
Military Dr. to Blanco Rd. for bridge deck work.
SH 218 – Pat Booker Road.
- Tuesday, June 1 until
Friday, June 4. Nightly 9 p.m. to 5 a.m. Alternating single lane closures, in
both directions, at Loop 1604 for bridge work.
FM 1976 – Walzem Road/Gibbs Sprawl Road
- Current until Friday, June 18. 8 a.m. to 5 p.m. Alternating northbound lane closures from Toepperwein Rd. to Hilltop Rd. for paving operations.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.