Friday, May 21

UPCOMING SCHEDULED CONSTRUCTION LANE CLOSURES



Loop 1604 – North Central San Antonio

  • Saturday, May 22 until Sunday, May 23. Weekend continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for asphalt paving.
  • Saturday, May 22 until Sunday, May 23. Weekend continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for asphalt paving. 

Loop 1604 – Far East San Antonio/Bexar County

  • Current until Friday, May 28. Nightly 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Palisades Dr. to Pat Booker Rd. for traffic switch.
  • Current until Friday, May 28. 9 a.m. to 3 p.m. Single lane closure on northbound frontage road from Pat Booker Rd. to Granada Dr. for column work. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound single mainlane closure, including the entrance ramp from SH 16 and exit ramp to Hausman Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use Kyle Seal Parkway entrance ramp and the exit ramp before Bandera Rd.
  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use the entrance ramp after Babcock Rd. and the exit ramp before Hausman Rd.
  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the exit ramp to La Cantera Parkway/Chase Hill, for restriping and barrier setting. DETOUR: Traffic will be directed to exit before Babcock Rd. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, May 22. 6 a.m. to 6 p.m. Single northbound lane closure from Bulverde Rd. to Trinity Park for shoulder improvements.
  • Monday, May 24 until Wednesday, May 26. 9 p.m. to 5 a.m. Full closure of Borgfeld Rd. intersection for drainage installation.
  • Saturday, May 22 until Sunday, May 23. Weekend continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, May 22 until Sunday, May 23. Weekend continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, May 22 until Sunday, May 23. Weekend overnight 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Saturday, May 22 until Sunday, May 23. Weekend overnight 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Monday, May 24 until Friday, May 28. Continuous 9 a.m. until 12 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for painting and signage installation.
  • Monday, May 24 until Friday, May 28. Continuous 9 a.m. until 12 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for painting and signage installation.
  • Monday, May 24 until Friday, May 28. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left onto Stone Oak Parkway and turn left onto the southbound US 281 frontage road.
  • Monday, May 24 until Friday, May 28. Daily 9 a.m. until 3 p.m. Northbound frontage road closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the southbound US 281 frontage road.
  • Monday, May 24 until Friday, May 28. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Turn left on Stone Oak Parkway and turn left onto the northbound US 281 frontage road.
  • Monday, May 24 until Friday, May 28. Daily 9 a.m. until 3 p.m. Southbound frontage road closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Turn left on Evans Road and turn left onto the northbound US 281 frontage Road.
  • Monday, May 24 until Friday, May 28. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure of the southbound US 281 flyover ramp to eastbound Loop 1604 for painting. DETOUR: Use the US 281 frontage road to access eastbound Loop 1604.
  • Monday, May 24 until Friday, May 28. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure of the southbound US 281 flyover ramp to westbound Loop 1604 for painting. DETOUR: Use the US 281 frontage road to access westbound Loop 1604.
  • Monday, May 24 until Friday, May 28. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, May 24 until Friday, May 28. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Friday, June 11 – 9 p.m. to Monday, June 14 – 5 a.m. Full closure of mainlanes from SH 46 to Scenic Loop Rd. for demolition of US 87 bridge. Lanes under Scenic Loop Rd. bridge will also be closed. DETOUR: Traffic will be directed to frontage roads. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, May 22. 5 a.m. to 9 p.m. Single westbound mainlane closure from Zuehl Rd. to Pfeil Rd., including the ramps at FM 2538, for barrier movement and asphalt operations.
  • Monday, May 24 until Thursday, May 27. Nightly 8:30 p.m. to 5:30 p.m. Alternating westbound mainlane closures from Zuehl Rd. to Pfeil Rd. for barrier setting.
  • Monday, May 24 until Thursday, May 27. Nightly 8:30 p.m. to 5:30 a.m. Alternating eastbound mainlane closures for barrier setting.
  • Monday, May 24 until Tuesday, May 25. 9 p.m. to 5 a.m. Double eastbound mainlane closure from W.W. White Rd. to Loop 410, including the exit ramp to Loop 410, for sign installations.
  • Monday, May 24 until Tuesday, May 25. 9 p.m. to 5 a.m. Double eastbound mainlane closure from FM 1516 to Loop 1604, including the exit ramp to Loop 1604, for sign installations.
  • Tuesday, May 25 until Wednesday, May 26. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from Woodlake Parkway to FM 1516, including the exit ramp to FM 1516, for sign installations.
  • Wednesday, May 26 until Thursday, May 27. 9 p.m. to 5 a.m. Double westbound mainlane closure from Loop 410 to W.W. White Rd. including the exit ramp to W.W. White Rd., for sign installations.
  • Wednesday, May 26 until Thursday, May 27. 9 p.m. to 5 a.m. Double westbound mainlane closure from FM 1516 to Martinez Creek, including the exit ramp to Woodlake Parkway, for sign installations.
  • Thursday, May 27 until Friday, May 28. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Woodlake Parkway to Foster Rd., including the exit ramp to Ackerman Rd., for sign installations.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, May 22. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Lane to Parkway intersection for work on retaining wall.
  • Current until Saturday, May 22. 9 a.m. to 5:30 p.m. Single southbound lane closure on frontage road from Hubertus Rd. to FM 2252 for miscellaneous work.
  • Current until Saturday, May 22. 9 a.m. to 5:30 p.m. Single northbound lane closure on frontage road from FM 2252 to Hubertus Rd. for material haul-off.
  • Current until Saturday, May 22. 9 a.m. to 5:30 p.m. Single southbound lane closure on frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Sunday, May 23 until Saturday, May 28. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from Schertz Parkway to FM 1103 for overhead sign replacement.
  • Sunday, May 23 until Saturday, May 28. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to FM 1103 for milling and overlay work.
  • Monday, May 24 until Thursday, May 27. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Ln. to the parkway intersection for retaining wall work.
  • Monday, May 24 until Saturday, May 29. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, May 24 until Saturday, May 29. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1003 to FM 2252 for material haul-off.
  • Thursday, May 27 until Friday, May 28. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 306 to Business 35 for barrier removal. 

I-35 – South San Antonio/Bexar County

  • Monday, May 24 until Friday, May 28. 9 a.m. to 4 p.m. Single left lane closure on northbound frontage road from Grosvenor St. to S.W. Military Dr. for construction of u-turn lane.
  • Monday, May 24 until Friday, May 28. 9 a.m. to 4 p.m. Single left lane closure on southbound frontage road from Rayburn Dr. to S.W. Military Dr. for construction of u-turn lane. 

I-410 – West San Antonio

  • Current until Monday, May 24. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, May 24. Nightly 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to Marbach Rd. for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Current until Monday, May 24. Nightly 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work.
  • Current until Monday, May 24. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Current until Monday, May 24. 9 a.m. to 3 p.m. Single lane closure on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection for bridge work. 

SH 151 – West San Antonio

  • Current until Monday, May 24. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, May 24. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, May 24. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 to Lakeside Parkway for bridge work.
  • Monday, May 24 until Monday, May 31. 9 a.m. to 3 p.m. Single lane closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge work.
  • Monday, May 24 until Monday, May 31. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 interchange for bridge work. 

FM 471 – Culebra Road

  • Current until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Mountain View to Les Harrison Dr. for sidewalk improvements. 

SH 16 – Bandera Road

  • Current until Friday, May 28. 9 a.m. to 4 p.m. Single right lane closures, in both directions, from N.W. Loop 410 to Braun Rd. for sidewalk and driveway improvements. 

Alamo Ranch Parkway

  • Monday, May 24 until Friday, May 28. 9 a.m. to 3 p.m. Single westbound mainlane closure from Loop 1604 to Lone Star Parkway for bridge construction.  

PA 1502 – Wurzbach Parkway

  • City of San Antonio project. Friday, May 21 – 9 p.m. to Monday, May 24 – 5 a.m. Full lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for work on bridge deck.
  • Monday, May 24 until Thursday, May 27. Nightly 9 p.m. to 5 a.m. Alternating lane closures, in both directions, at the intersection of Lockhill Selma Rd. for sign installations.
  • Monday, May 24 until Thursday, May 27. 9 p.m. to 5 a.m. Single eastbound lane closure at N.W. Military Hwy. for utility work. 

Lockhill Selma Road

  • Monday, May 24 until Thursday, May 27. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, at the Wurzbach Parkway intersection for sign installations. 

SH 218 – Pat Booker Road.

  • Current until Friday, May 28. 9 p.m. to 5 a.m. Full closure of eastbound lanes from Village Oak Dr. to Athenian Dr. for traffic switch.

Loop 13 – Military Drive

  • Current until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Quintana Rd. to Bynum Ave. for sidewalk improvements.
  • Current until Friday, May 28. 8:30 a.m. to 3:30 p.m. Single eastbound lane closure from Quintana Rd. to New Laredo Hwy. for driveway and sidewalk improvements. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until Monday, May 31. 8 a.m. to 5 p.m. Alternating northbound lane closures from Toepperwein Rd. to Hilltop Rd. for paving operations.
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

Hildebrand Road

  • Monday, May 24 until Friday, May 28. 9 a.m. to 4 p.m. Single left lane closure, in both directions, from Brackenridge Rd. to US 281 for construction of left turn lane. 

I-37 – Atascosa County

  • Current until Tuesday, May 25. Daily 7 a.m. to 8 p.m. Single mainlane closures, in both directions, from mile marker 105 to mile marker 111 for paving operations.