Friday, January 15

Next week's construction-related closures



I-10 – Boerne
  • Tuesday-Wednesday, January 19-20. 9 a.m. until 3:30 p.m. daily. Eastbound main lanes at Scenic Loop Road. The left lane will close while crews do road work. This closure was initially scheduled for overnight, but cold temperatures are prohibitive.
  • Wednesday-Friday, January 20-22. 9 p.m. until 5 a.m. nightly. Eastbound main lanes at Scenic Loop Road. The right lane will close while crews set barrier.
I-10 – East San Antonio
  • Sunday-Friday, January 17-22. 8 p.m. until 5 a.m. nightly. Eastbound exit ramp to southbound I-37. The right lane will close while crews do road work.
I-10 – Downtown San Antonio
  • Sunday, January 17-Monday, February 15. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, between North Colorado and Fredericksburg Road (lower level). The right lane will close while crews do overhead bridge work. Crews will not perform work on Friday or Saturday nights.
I-35 – East San Antonio
  • Current thru January 2016. Exit ramps, both directions, to Eisenhauer Road. The ramps will close while crews build a new exit ramp. Traffic will use the next available ramp and turn around to reach Eisenhauer Road.
  • Current thru January 2016. Northbound entrance ramp from Eisenhauer Road. The ramp will close while crews build a new entrance ramp. Traffic will use the next available ramp.
  • Sunday, January 17. 5 a.m. until 3 p.m. Southbound main lanes between Eisenhauer and George Beach. Alternating lanes – two at a time – will close while crews restripe the road.
  • Sunday-Friday, January 17-22. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Binz-Engleman and AT&T Center Parkway. Alternating lanes will close while crews do road work.
  • Sunday-Friday, January 17-22. 9 p.m. until 5 a.m. nightly. Frontage road, both directions, between Binz-Engleman and AT&T Center Parkway. Alternating lanes will close while crews do road work.
  • Sunday-Friday, January 17-22. 9 p.m. until 5 a.m. nightly. Turnarounds, both directions, at Salado Creek. The turnarounds will be closed while crews do bridge work.
  • Monday-Friday, January 18-22. 9 a.m. until 3 p.m. daily. Frontage road, both directions, between Binz-Engleman and AT&T Center Parkway. Alternating lanes will close while crews do bridge work.
  • Monday-Friday, January 18-22. 9 a.m. until 3 p.m. daily. Turnarounds, both directions, at Salado Creek. The turnarounds will be closed while crews do bridge work.
I-410 – Northwest San Antonio
  • Saturday, January 16. 6 a.m. until 5 p.m. Frontage roads, both directions, between Ingram Road and Highway 151. Rolling, alternating lanes will close while crews refresh lane markings.
U.S. Hwy 90 – West San Antonio
  • Current until May 2016. Westbound frontage road between Hunt Lane and East Kriewald. The frontage road will close while crews reconstruct the Medio Creek Bridge.
Hwy 151 – Northwest San Antonio
  • Current until December 2016. Westbound exit ramp to Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed.
  • Current until December 2016. Eastbound entrance ramp from Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed.
  • Saturday, January 16. 6 a.m. until 5 p.m. Frontage road, both directions, between Hunt Lane and I-410. Rolling, alternating lanes will close will close while crews refresh pavement markings.
Other roads – Bulverde
  • Saturday-Sunday, January 16-17. 9 p.m. until 6 a.m. Highway 46, both directions, at U.S. Highway 281. The traffic signal will be turned off while crews install temporary signals. Officers will be on site to direct traffic.
  • Thursday-Friday, January 21-22. 9 p.m. until 6 p.m. daily. Highway 46 ramp to northbound U.S. Highway 281. The ramp will close while crews install drain pipe across the road. All traffic will use the connector from westbound Hwy 46 to reach northbound U.S. 281.
Other roads – New Braunfels
  • Monday-Friday, January 18-22. 9 a.m. until 4 p.m. daily. FM 306, both directions, between Hunter Road and Hoffman Lane. One-way traffic control will be used while crews install storm drain structures.
Other roads – Schertz
  • Monday-Friday, January 18-22. 9 a.m. until 4 p.m. daily. FM 3009, both directions, between I-35 and FM 78. The right lane will close in each direction as needed while crews do sidewalk work.
Other roads – Northwest San Antonio
  • Monday-Wednesday, January 18-20. 9 a.m. until 4 p.m. UTSA Boulevard, both directions, between Edward Ximenes and UTEX Boulevard. One-way traffic control will be employed while crews restripe the roadway and set barrier. Drivers heading to UTSA main campus should use Loop 1604 to reach their destination.
All closures are pending weather.