Friday, June 17

Next week's construction-related closures

I-10 – Downtown San Antonio
  • Sunday-Friday, June 19-24. 8 p.m. until 5 a.m. nightly. Main lanes, both directions, between I-410 and I-35. The right lane will close while crews lay asphalt. This closure includes closures of the ramps around Martin Luther King boulevard and Houston Street.
  • Monday-Friday, June 20-24. 9 a.m. until 4 p.m. nightly. Main lanes, both directions, between I-410 and I-35. The right lane will close while crews work on guardrail.
I-35 – East San Antonio
  • Current thru July 2016. Exit ramps, both directions, to Eisenhauer Road. The ramps will close while crews build a new exit ramp. Traffic will use the next available ramp and turn around to reach Eisenhauer Road.
  • Current thru July 2016. Northbound entrance ramp from Eisenhauer Road. The ramp will close while crews build a new entrance ramp. Traffic will use the next available ramp.
  • Friday, June 17 at 9 p.m. until Monday, June 20 at 5 a.m. Northbound main lanes between AT&T Center Parkway and Binz-Engleman. Alternating lanes will close, two at a time, while crews do finish work on the roadway.
  • Friday, June 17 at 10 p.m. until Monday, June 20 at 5 a.m. Northbound connector to southbound I-410. The ramp will close while crews repave the road. Traffic will follow the posted detour.
  • Friday, June 17 at 10 p.m. until Monday, June 20 at 5 a.m. Southbound main lanes between AT&T Center Parkway and Binz-Engleman. All lanes will close while crews repave the roadway. Traffic will exit Splashtown Drive and re-enter the highway at the next available ramp.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Northbound main lanes between AT&T Center Parkway and Binz-Engleman. Alternating lanes will close while crews do finishing road work.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Frontage road, both directions, between Walzem and Rittiman. Alternating lanes will close while crews do finish work on the road.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Rittiman Road and George Beach. The two right lanes will close while crews do work on the retaining walls. This closure includes the ramp to southbound I-410. Traffic will exit Rittiman Road and follow the frontage road to reach the ramp.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Frontage road, both directions, between Walzem and Rittiman roads. Alternating lanes will close while crews do utilities work.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Walzem and Rittiman. Alternating lanes will close while crews do road work.
  • Monday-Tuesday, June 20-21. 8 p.m. until 5 a.m. Southbound main lanes between Binz-Engleman and AT&T Center Parkway. Alternating lanes will close, two at a time, while crews do concrete work.
  • Monday-Friday, June 20-24. 9 a.m. until 3:30 p.m. Frontage roads, both directions, between Walzem and Rittiman. Alternating lanes will close while crews do road work.
  • Tuesday-Friday, June 21-24. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Binz-Engleman and AT&T Center Parkway. Alternating lanes will close, two at a time, while crews do concrete work.
  • Friday, June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Northbound connector to southbound I-410. The ramp will close while crews repave the road. Traffic will follow the posted detour.
I-410 – Northeast San Antonio
  • Saturday, June 18. 6 a.m. until 2 p.m. Eastbound connector to northbound I-35. The right lane will close while crews work on a retaining wall. This closure includes the ramp to Randolph Boulevard and Windcrest. Traffic will exit Thousand Oaks, use the turnaround and approach Randolph Boulevard from the southbound frontage road of I-35.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Eastbound connector to northbound I-35. The right lane will close while crews work on a retaining wall. This closure includes the ramp to Randolph Boulevard and Windcrest. Traffic will exit Thousand Oaks, use the turnaround and approach Randolph Boulevard from the southbound frontage road of I-35.
US Hwy 90 – West San Antonio
  • Current until July 2016. Westbound frontage road between Hunt Lane and East Kriewald. The frontage road will close while crews reconstruct the Medio Creek Bridge.
  • Sunday-Friday, June 19-24. 8:30 p.m. until 5:30 a.m. nightly. Main lanes, both directions, between I-410 and Loop 1604. The right lane will close while crews move barrier.
Loop 1604 – Northwest San Antonio
  • Current through Friday, June 24. 9 a.m. until 4 p.m. daily. Frontage roads, both directions, between Culebra and Bandera roads. Alternating lanes will close while crews lay asphalt and stripe the roadway. This closure includes ramps as needed. Only one ramp will close at a time.
  • Current through Friday, June 24. 9 p.m. until 5 a.m. nightly. Frontage roads, both directions, between Culebra and Bandera roads. Alternating lanes will close while crews lay asphalt and stripe the roadway. This closure includes ramps as needed. Only one ramp will close at a time.
Hwy 151 – West San Antonio
  • Current through July 2016. East-to-West turnaround at I-410. The turnaround will close while crews work on bridge support structures overhead.
  • Current until December 2016. Westbound exit ramp to Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed.
  • Current until December 2016. Eastbound entrance ramp from Ingram and Potranco roads. The ramp will remain closed while crews install bridge support structures for the direct connector ramps being constructed.
  • Sunday-Friday, June 19-24. 9 p.m. until 5 a.m. nightly. Eastbound frontage road between Ingram Road and I-410. The left two lanes will close while crews set bridge deck panels on the new direct connector. This closure includes the eastbound exit ramp to I-410. Traffic will use the previous exit and travel along the frontage road to reach its destination.
Other roads – Comal County
  • Sunday-Monday, June 19-20. 9 p.m. until 5 a.m. Hwy 46, both directions, between Old Boerne Road and US Hwy 281. Alternating lanes will close while crews install traffic signals.
Other roads – Kendall County
  • Sunday-Friday, June 19-24. 9 p.m. until 5:30 a.m. nightly. Hwy 46, both directions, between Main Street and Thunder Valley Road. Alternating lanes will close while crews repair the roadway.
  • Sunday-Friday, June 26-July 1. 9 p.m. until 5:30 a.m. nightly. Hwy 46, both directions, between Main Street and Thunder Valley Road. Alternating lanes will close while crews repair the roadway.
Other roads – Northwest San Antonio
  • Wednesday, June 22. 9 a.m. until 3 p.m. UTSA Boulevard, both directions, at Leon Creek. The road will be down to a single lane, with traffic controlled by flaggers, while crews set bridge deck beams.
All closures are pending weather.