I-35 – East San Antonio
- Current
thru July 2016. Exit ramps, both directions, to Eisenhauer Road. The ramps
will close while crews build a new exit ramp. Traffic will use the next
available ramp and turn around to reach Eisenhauer Road.
- Current
thru July 2016. Northbound entrance ramp from Eisenhauer Road. The ramp
will close while crews build a new entrance ramp. Traffic will use the
next available ramp.
- Friday,
June 24 at 9 p.m. until Monday, June 27 at 5 a.m. Northbound main lanes
between AT&T Center Parkway and Binz-Engleman. Alternating lanes will
close, two at a time, while crews do finish work on the roadway.
- Friday,
June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Northbound connector to
southbound I-410. The ramp will close while crews repave the road. Traffic
will follow the posted detour.
- Friday,
June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Southbound main lanes
between AT&T Center Parkway and Binz-Engleman. All lanes will close
while crews repave the roadway. Traffic will exit Splashtown Drive and
re-enter the highway at the next available ramp.
- Friday,
June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Northbound connector to
southbound I-410. The ramp will close while crews repave the road. Traffic
will follow the posted detour.
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions,
between AT&T Center Parkway and Binz-Engleman. Alternating lanes will
close while crews do finishing road work.
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5 a.m. nightly. Frontage road, both
directions, between AT&T Center Parkway and Binz-Engleman. The left
lane will close while crews do finish work.
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5 a.m. nightly. Frontage road, both
directions, between Walzem and Rittiman. Alternating lanes will close
while crews do finish work on the road.
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions,
between Walzem and Rittiman. Alternating lanes will close while crews do
road work.
- Monday-Friday,
June 27-July 1. 9 a.m. until 3:30 p.m. Frontage roads, both directions,
between Walzem and Rittiman. Alternating lanes will close while crews do
road work.
- Wednesday-Thursday,
June 29-30. 7 p.m. until 5 a.m. Northbound exit ramp to westbound I-410.
The ramp will close while crews set beams for the Thousand Oaks Bridge.
Traffic will exit Walzem Road and continue along the frontage road to
reach the connector to westbound I-410.
I-35 – South San Antonio
- Monday-Thursday,
June 27-30. 8 a.m. until 5 p.m. daily. Southbound main lanes between
Benton City Road and Loop 1604. All lanes will close while crews resurface
the road. Traffic will exit Kinney Road and re-enter the highway at the
next available ramp.
I-410 – Northeast San Antonio
- Wednesday-Thursday,
June 29-30. 7 p.m. until 5 a.m. Eastbound exit ramp to Randolph Boulevard.
The ramp will close while crews set bridge beams. Traffic will follow the
posted detour route.
I-410 – Northwest San Antonio
- Saturday,
June 25. 5 a.m. until 8 a.m. Southbound frontage road at Hwy 151. All
lanes will close while crews set up a crane. Traffic will use the
eastbound frontage roads of Hwy 151 to Ingram Road, turn around and
approach I-410 along the westbound frontage road of Hwy 151.
US Hwy 90 – West San Antonio
- Current
until July 2016. Westbound frontage road between Hunt Lane and East
Kriewald. The frontage road will close while crews reconstruct the Medio
Creek Bridge.
Loop 1604 – Northwest San Antonio
- Current
through Friday, July 1. 9 a.m. until 4 p.m. daily. Frontage roads, both
directions, between Culebra and Bandera roads. Alternating lanes will
close while crews lay asphalt and stripe the roadway. This closure
includes ramps as needed. Only one ramp will close at a time.
- Current
through Friday, July 1. 9 p.m. until 5 a.m. nightly. Frontage roads, both
directions, between Culebra and Bandera roads. Alternating lanes will
close while crews lay asphalt and stripe the roadway. This closure
includes ramps as needed. Only one ramp will close at a time.
Hwy 151 – West San Antonio
- Current
through July 2016. East-to-West turnaround at I-410. The turnaround will
close while crews work on bridge support structures overhead.
- Current
until December 2016. Westbound exit ramp to Ingram and Potranco roads. The
ramp will remain closed while crews install bridge support structures for
the direct connector ramps being constructed.
- Current
until December 2016. Eastbound entrance ramp from Ingram and Potranco
roads. The ramp will remain closed while crews install bridge support
structures for the direct connector ramps being constructed.
Other roads – Kendall County
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5:30 a.m. nightly. US 87 (Main Street), both
directions, at Hwy 46. The right lane will close while crews do roadway
repair.
- Sunday-Friday,
June 26-July 1. 9 p.m. until 5:30 a.m. nightly. Hwy 46, both directions,
between Main Street and Thunder Valley Road. Alternating lanes will close
while crews repair the roadway.
Other
roads – East San Antonio
- Wednesday-Thursday, June 29-30.
7 p.m. until 5 a.m. Randolph Boulevard, both directions, between Crestway
and I-35. All lanes will close while crews set bridge support beams
overhead. Traffic will follow the posted detour.
Other
roads – South San Antonio
- Sunday-Tuesday, June 26-30. 7
p.m. until 6 a.m. nightly. WW White between Fairlawn and I-10. The left
lane will close while crews resurface the roadway.
- Tuesday, June 28. 9 a.m. until
4 p.m. Eastbound SW Military Drive at Leon Creek. The right lane will
close while crews repair guardrail.