I-35 – East San Antonio
- Current
     thru July 2016. Exit ramps, both directions, to Eisenhauer Road. The ramps
     will close while crews build a new exit ramp. Traffic will use the next
     available ramp and turn around to reach Eisenhauer Road.
- Current
     thru July 2016. Northbound entrance ramp from Eisenhauer Road. The ramp
     will close while crews build a new entrance ramp. Traffic will use the
     next available ramp.
- Friday,
     June 24 at 9 p.m. until Monday, June 27 at 5 a.m. Northbound main lanes
     between AT&T Center Parkway and Binz-Engleman. Alternating lanes will
     close, two at a time, while crews do finish work on the roadway.
- Friday,
     June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Northbound connector to
     southbound I-410. The ramp will close while crews repave the road. Traffic
     will follow the posted detour.
- Friday,
     June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Southbound main lanes
     between AT&T Center Parkway and Binz-Engleman. All lanes will close
     while crews repave the roadway. Traffic will exit Splashtown Drive and
     re-enter the highway at the next available ramp.
- Friday,
     June 24 at 10 p.m. until Monday, June 27 at 5 a.m. Northbound connector to
     southbound I-410. The ramp will close while crews repave the road. Traffic
     will follow the posted detour.
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions,
     between AT&T Center Parkway and Binz-Engleman. Alternating lanes will
     close while crews do finishing road work.
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5 a.m. nightly. Frontage road, both
     directions, between AT&T Center Parkway and Binz-Engleman. The left
     lane will close while crews do finish work.
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5 a.m. nightly. Frontage road, both
     directions, between Walzem and Rittiman. Alternating lanes will close
     while crews do finish work on the road.
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions,
     between Walzem and Rittiman. Alternating lanes will close while crews do
     road work.
- Monday-Friday,
     June 27-July 1. 9 a.m. until 3:30 p.m. Frontage roads, both directions,
     between Walzem and Rittiman. Alternating lanes will close while crews do
     road work.
- Wednesday-Thursday,
     June 29-30. 7 p.m. until 5 a.m. Northbound exit ramp to westbound I-410.
     The ramp will close while crews set beams for the Thousand Oaks Bridge.
     Traffic will exit Walzem Road and continue along the frontage road to
     reach the connector to westbound I-410.
I-35 – South San Antonio
- Monday-Thursday,
     June 27-30. 8 a.m. until 5 p.m. daily. Southbound main lanes between
     Benton City Road and Loop 1604. All lanes will close while crews resurface
     the road. Traffic will exit Kinney Road and re-enter the highway at the
     next available ramp.
I-410 – Northeast San Antonio
- Wednesday-Thursday,
     June 29-30. 7 p.m. until 5 a.m. Eastbound exit ramp to Randolph Boulevard.
     The ramp will close while crews set bridge beams. Traffic will follow the
     posted detour route.
I-410 – Northwest San Antonio
- Saturday,
     June 25. 5 a.m. until 8 a.m. Southbound frontage road at Hwy 151. All
     lanes will close while crews set up a crane. Traffic will use the
     eastbound frontage roads of Hwy 151 to Ingram Road, turn around and
     approach I-410 along the westbound frontage road of Hwy 151.
US Hwy 90 – West San Antonio
- Current
     until July 2016. Westbound frontage road between Hunt Lane and East
     Kriewald. The frontage road will close while crews reconstruct the Medio
     Creek Bridge.
Loop 1604 – Northwest San Antonio
- Current
     through Friday, July 1. 9 a.m. until 4 p.m. daily. Frontage roads, both
     directions, between Culebra and Bandera roads. Alternating lanes will
     close while crews lay asphalt and stripe the roadway. This closure
     includes ramps as needed. Only one ramp will close at a time.
- Current
     through Friday, July 1. 9 p.m. until 5 a.m. nightly. Frontage roads, both
     directions, between Culebra and Bandera roads. Alternating lanes will
     close while crews lay asphalt and stripe the roadway. This closure
     includes ramps as needed. Only one ramp will close at a time.
Hwy 151 – West San Antonio
- Current
     through July 2016. East-to-West turnaround at I-410. The turnaround will
     close while crews work on bridge support structures overhead.
- Current
     until December 2016. Westbound exit ramp to Ingram and Potranco roads. The
     ramp will remain closed while crews install bridge support structures for
     the direct connector ramps being constructed. 
- Current
     until December 2016. Eastbound entrance ramp from Ingram and Potranco
     roads. The ramp will remain closed while crews install bridge support
     structures for the direct connector ramps being constructed.
Other roads – Kendall County
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5:30 a.m. nightly. US 87 (Main Street), both
     directions, at Hwy 46. The right lane will close while crews do roadway
     repair.
- Sunday-Friday,
     June 26-July 1. 9 p.m. until 5:30 a.m. nightly. Hwy 46, both directions,
     between Main Street and Thunder Valley Road. Alternating lanes will close
     while crews repair the roadway.
Other
roads – East San Antonio
- Wednesday-Thursday, June 29-30.
     7 p.m. until 5 a.m. Randolph Boulevard, both directions, between Crestway
     and I-35. All lanes will close while crews set bridge support beams
     overhead. Traffic will follow the posted detour.
Other
roads – South San Antonio
- Sunday-Tuesday, June 26-30. 7
     p.m. until 6 a.m. nightly. WW White between Fairlawn and I-10. The left
     lane will close while crews resurface the roadway.
- Tuesday, June 28. 9 a.m. until
     4 p.m. Eastbound SW Military Drive at Leon Creek. The right lane will
     close while crews repair guardrail.