Friday, April 28

Next week's construction-related closures

Now that Fiesta is winding down, we'll have a little more activity around the downtown area. Here's what's happening over the next week:

I-10 – Seguin
  • Current through Monday, May 29 at 4 p.m. Westbound frontage road between Business 123 and Grein Place. Alternating lanes will close while crews convert the frontage road to one-way only. This closure includes the intersection of Guadalupe Street as needed.
I-10 – East San Antonio
  • Friday, April 28 at 7 p.m. until Monday, May 1 at 5 a.m. Westbound frontage road between Foster Road and Woodlake Parkway. All lanes will close while crews install storm drains. Traffic will use Foster Road or FM 1516 to reach its destination.
I-35 – New Braunfels
  • Current until Tuesday, May 2 at 5 a.m. Southbound entrance ramp from FM 725. The ramp will close while crews do repair work. Traffic will use the next available ramp.
  • Current until Tuesday, May 2 at 5 a.m. Southbound main lanes between FM 725 and Schmidt Street. The two right lanes will remain closed while crews repair the road. The main lanes of I-35 will be reduced to two lanes during this period.
  • Sunday-Monday, April 30-May 1. 8 p.m. until 6 a.m. Main lanes, both directions, between FM 306 and the Comal-Hayes county line. Alternating lanes will close while crews resurface the road.
  • Sunday-Friday, April 30-May 5. 9 p.m. until 6 a.m. nightly. Northbound main lanes between Schmidt Road and FM 725. Alternating lanes will close while crews repair the roadway.
  • Monday, May 1. 8 p.m. until 11 p.m. Southbound frontage road at FM 725. The left lane will close while crews move barrier.
  • Monday, May 1. 9 p.m. until 11 p.m. Southbound main lanes between FM 725 and Schmidt Street. The three right lanes will close while crews move barrier.
  • Monday-Tuesday, May 1-2. 11 p.m. until 6 a.m. Southbound main lanes between FM 725 and Schmidt Street. All lanes will close while crews move barrier and restripe the road. When finished the highway will be returned to full capacity. Traffic will exit FM 725, continue along the frontage road and re-enter the highway at the next available ramp.
I-35 – Northeast San Antonio
  • Monday-Friday, May 1-5. 9 p.m. until 5 a.m. Northbound main lanes between Eisenhauer and Thousand Oaks. Alternating lanes will close while crews do road work.
  • Tuesday, May 2. 10 a.m. until 3 p.m. Northbound main lanes at AT&T Center Parkway. The right lane will close while crews pour concrete.
  • Monday-Tuesday, May 8-9. 9 p.m. until 5 a.m. Main lanes, both directions, at New Braunfels Avenue. All lanes will close while crews set bridge support beams. Traffic will exit New Braunfels Avenue, pass through the intersection and re-enter the highway. This closure includes the New Braunfels Avenue bridge. Traffic will use Walters Street to cross I-35.
  • Monday, May 8 at 9 p.m. until Tuesday, August 1 at 5 a.m. Turnarounds, both directions, at Walzem Road. The turnarounds will remain closed while crews do overhead bridge work.
I-35 – Downtown
  • Monday-Tuesday, May 1-2. 9 p.m. until 5 a.m. Northbound main lanes between I-10 and I-37. All upper level lanes will close while crews do bridge work. Upper level traffic will exit McCullough Avenue and follow the posted detour signs to continue back onto northbound I-35. Lower level traffic will continue as normal.
I-410 – Northwest San Antonio
  • Current until August 31. Northbound exit to Culebra Road. The exit will close while crews widen the main lanes and frontage road. Traffic will exit Ingram Road, turn around and get to Culebra on the southbound frontage road.
  • Monday-Friday, May 1-5. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Marbach and U.S. Hwy 90. Alternating lanes will close while crews restripe the roads.
  • Tuesday, May 2. 10 a.m. until 2 p.m. Southbound main lanes at US Hwy 90. The right lane will close while crews install a temporary light pole.
  • Tuesday-Wednesday, May 2-3. 9 p.m. until 5 a.m. Southbound frontage road between Pilar Street and Bertetti Drive. All lanes will close while crews install a gas line. Traffic will use Zabra and Tarasco streets to reach its destination.
  • Wednesday-Friday, May 3-5. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Marbach Road and U.S. Hwy 90. Alternating lanes will close while crews move barrier.
I-410 – East San Antonio
  • Current through Saturday, April 29 at 5 p.m. Northbound main lanes at East Houston Street. The right lane will close while crews repair the roadway.
U.S. Hwy 90 – Downtown San Antonio
  • Current through May 31. Eastbound exit ramp to I-35. The ramp has been reduced to a single lane while crews do bridge repair work.
U.S. Hwy 281 – North-central San Antonio
  • Monday-Friday, May 1-5. 9 p.m. until 6 a.m. nightly. Southbound main lanes between I-410 and Newel Avenue. The two right lanes will close while crews resurface the roadway. This closure includes ramps as needed. Traffic will use the next available ramp.
Hwy 151 – Northwest San Antonio
  • Current until August 31. Westbound exit ramp to Hunt Lane. The exit will close while crews work on retaining walls. Traffic will exit Ingram Road and follow the frontage road to reach its destination.
  • Monday, May 1. 9 a.m. until 4 p.m. Westbound main lanes between Loop 1604 and Westwood Loop. The right lane will close while crews repair damaged delineators.
Other roads – Seguin
  • Current until August 31. Austin Street between Martindale and Seidman. The road will be converted to one-way only, moving southbound only, while crews do road work. Northbound traffic will use Guadalupe Street to reach its destination.
  • Saturday, April 29 at 6 a.m. until Sunday, April 30 at 6 a.m. The intersection of Rosemary Street and Austin Street. The intersection will close in all directions while crews install utility lines. Traffic will follow the posted detour route.
  • Sunday, April 30 at 6 a.m. until Monday, May 1 at 6 a.m. The intersection of Mesquite Street and Austin Street. The intersection will close in all directions while crews install utility lines. Traffic will follow the posted detour route.
Other roads – Boerne
  • Friday, May 5 at 9 p.m. until Saturday, May 6 at 5 p.m. Scenic Loop Road, both directions, at I-10. All lanes will close while crews do overhead bridge work. Traffic will use crossovers at Balcones Creek or at Business 87 to reach its destination.
Other roads – Northeast San Antonio
  • Friday, May 19 at 9 p.m. until Sunday, May 21 at 5 a.m. Walzem, both directions, at I-35. All lanes will close while crews do overhead bridge work. Traffic will use the frontage road to the next intersection and turn around to reach its destination.
All closures are pending weather.