I-10 – Boerne
- Friday, July 28 at 9 p.m. until Monday, July 31 at 5 a.m. Westbound exit ramp to Hwy 46 (Exit 540). The ramp will close while crews open up a new ramp configuration. Traffic will exit Business 87 ant turn left onto Bandera Road (Hwy 46) to reach its destination.
I-10 – East San Antonio
- Sunday-Monday, July 30-31. 8 p.m. until 5 a.m. Eastbound main lanes between Roland Avenue and Amanda Street. The left lane will close while crews build support structures.
- Monday, July 31 until Saturday, August 12. 7:30 a.m. until 5 p.m. daily except Sundays. Westbound frontage road between Foster Road and FM 1516. Alternating lanes will close while crews install storm drain.
- Wednesday-Thursday, August 9-10. 9 a.m. until 3 p.m. daily. Westbound exit ramp to FM 1516. The ramp will close while crews install storm drains. Traffic will exit Loop 1604, turn around and use the westbound frontage road to reach FM 1516.
- Saturday, August 12. 7 a.m. until 7 p.m. Westbound entrance ramp from FM 1516. The ramp will close while crews install storm drain. Traffic will use the next available ramp.
I-35 – Northeast San Antonio
- Current until Tuesday, August 1 at 5 a.m. Turnarounds, both directions, at Walzem Road. The turnarounds will remain closed while crews do overhead bridge work.
- Saturday, July 29 at 5 a.m. until Sunday, July 30 at 5 a.m. Northbound main lanes between George Beach and Thousand Oaks. Alternating lanes will close while crews lay asphalt, hang signs and work on ramps.
- Sunday, July 30 until Wednesday, August 2. 9 p.m. until 5 a.m. nightly. Southbound main lanes at Randolph Boulevard. The right lane will close while crews repair concrete barrier. This closure includes the exit ramp to Randolph Boulevard. Traffic will use the next available ramp and turn around to reach its destination.
- Monday, July 31 until Friday, August 11. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Thousand Oaks and George Beach. Alternating lanes will close while crews work on the center median and lay asphalt.
- Saturday, August 5 at 5 a.m. until Sunday, August 6 at 5 a.m. Southbound main lanes between George Beach and Thousand Oaks. Alternating lanes will close while crews work on new ramps.
I-35 – East San Antonio
- Friday, August 11 at 9 p.m. until Monday, August 14 at 5 a.m. Main lanes, both directions, at New Braunfels Avenue. All lanes will close while crews demo the old bridge deck. Traffic will exit New Braunfels Avenue, continue along the frontage road and re-enter at the next available ramp.
I-410 – South San Antonio
- Monday, July 31. 9 a.m. until 3 p.m. Eastbound main lanes at Roosevelt Road. Alternating lanes will close as needed while crews do concrete work.
I-410 – Northwest San Antonio
- Current until Monday, July 31. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Marbach Road and US Hwy 90. Alternating lanes will close while crews set concrete forms.
- Current until August 31. Northbound exit to Culebra Road. The exit will close while crews widen the main lanes and frontage road. Traffic will exit Ingram Road, turn around and get to Culebra on the southbound frontage road.
- Current until Friday, September 1. 9 p.m. until 5 a.m. nightly, Sunday nights through Thursday nights as needed only. Northbound main lanes between Marbach Road and Military Drive. All lanes will close while crews do overhead bridge work. Traffic will exit Hwy 151, continue along the frontage road and enter the highway at the next available ramp. Officers will control traffic at intersections. This closure will not be employed simultaneously with the northbound frontage road closure.
- Current until Friday, September 1. 9 p.m. until 5 a.m. nightly, Sunday nights through Thursday nights as needed only. Northbound frontage road between Marbach Road and Military Drive. All lanes will close while crews do overhead bridge work. Traffic will use eastbound Hwy 151 and Military Drive to reach its destination. Officers will control traffic at intersections as needed. This closure will not be employed simultaneously with the northbound main lanes closure.
U.S. Hwy 90 – West San Antonio
- Monday, July 31 until August 1. 9 p.m. until 5:30 a.m. Main lanes, both directions, between Hunt Lane and Loop 1604. The right lane will close while crews paint bridge rails.
- Tuesday-Wednesday, August 1-2. 9 p.m. until 5:30 a.m. Westbound main lanes at Loop 1604. All lanes will close while crews do overhead bridge work. Traffic will exit Loop 1604 and re-enter the main lanes at the next available ramp.
- Tuesday-Friday, August 1-4. 9 p.m. until 5:30 a.m. nightly. West-to-east turnaround at Loop 1604. The turnaround will close while crews paint the bridge rails.
- Thursday-Friday, August 3-4. 9 p.m. until 5:30 a.m. Eastbound main lanes at Loop 1604. All lanes will close while crews do overhead bridge work. Traffic will exit Loop 1604 and re-enter the main lanes at the next available ramp.
U.S. Hwy 281 – North San Antonio
- Sunday, July 30-Thursday, August 3. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Loop 1604 and Stone Oak Parkway. Alternating lanes will close while crews retrace pavement stripes. This closure will be a rolling closure, meaning the closure area will slowly progress from one end of the project to the other with only a short segment of road being closed.
- Monday-Tuesday, August 7-8. 9 p.m. until 5 a.m. Southbound main lanes between Marshall Road and Stone Oak Parkway. The right lanes will close while crews set barrier.
- Tuesday-Thursday, August 8-10. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Stone Oak Parkway and Evans Road. The right lanes will close while crews set barrier.
- Thursday-Friday, August 10-11. 9 p.m. until 5 a.m. Southbound main lanes between Evans Road and Encino Rio. The right lanes will close while crews set barrier.
U.S. Hwy 281 – Near North San Antonio
- Sunday, July 30-Friday, August 4. 9 p.m. until 6 a.m. nightly. Northbound main lanes between I-35 and Tuleta Drive. The left lanes will close while crews repair bridge joints.
Hwy 151 – Northwest San Antonio
- Current until August 31. Westbound exit ramp to Hunt Lane. The exit will close while crews work on retaining walls. Traffic will exit Ingram Road and follow the frontage road to reach its destination.
Other roads – Seguin
- Current until August 31. Austin Street between Martindale and Seidman. The road will be converted to one-way only, moving southbound only, while crews do road work. Northbound traffic will use Guadalupe Street to reach its destination.
- Friday, July 28 at 8 p.m. until Monday, July 31 at 6 a.m. Southbound Austin Street between Baxter and West New Braunfels streets. The southbound lane will be closed while crews install storm drain boxes. Traffic will use Hwy 46 or the Hwy 123 bypass to reach its destination.
Other roads – New Braunfels
- Current until Friday, August 18. 8:30 a.m. until 4 p.m. daily, Monday-Friday only. Hwy 46, both directions, between FM 758 and I-35. The right lane will close while crews replace curb and install traffic signals and guardrail.
Other roads – Northeast San Antonio
- Friday, August 4 at 9 p.m. until Monday, August 7 at 5 a.m. Walzem Road, both directions, at I-35. All lanes will close while crews work on columns. Traffic will turn right onto the frontage road and turn around at the next cross street to reach its destination.
Other roads – East San Antonio
- Friday, August 11 at 9 p.m. until Monday, August 14 at 5 a.m. New Braunfels Avenue, both directions, at I-35. All lanes will close while crews demo the old bridge deck. Traffic will be allowed to turn right onto the frontage roads and will use Walters Street to cross I-35.
Other roads – Northwest San Antonio
- Current until Saturday, August 5. 9 p.m. until 5 a.m. nightly, Sunday night through Thursday night as needed only. Potranco Road, both directions, at Hwy 151. All lanes will close while crews do overhead bridge work. Traffic will use the frontage roads and turn around at the next available location to reach its destination.
- Thursday-Friday, August 3-4. 9 p.m. until 5 a.m. Potranco Road, both directions, between Waterstone Place and Loop 1604. All lanes will close while crews do overhead bridge work. Traffic will use Military Drive to reach its destination.
All closures are pending weather.