Thursday, September 27

Work On US 281 Expansion Project Requires Closures

The ongoing US 281 expansion project will require the following closures:

From tonight, Thursday, September 27 at 9 p.m. until Friday, September 28 at 5 a.m., there'll be a full closure of eastbound and westbound Redland Road at the approach of US 281 northbound; traffic to be diverted to Ridgewood Parkway and Sonterra Boulevard back to US 281.





Center/right lane closure on northbound US 281 from Sonterra Boulevard to Redland Road (note that only one lane will remain open).

Retaining Wall / Substructure work for this weekend 

For this portion of construction, the following closure will be required from 3 a.m. Saturday, September 29 until 5 a.m. Monday (October 1) at 5 a.m.

Center/right lane closure on northbound US 281 from Donella entrance ramp to Sonterra Boulevard entrance ramp (includes closing the Sonterra Boulevard exit ramp). Traffic will be diverted to use the Frontage Road exit ramp (note that only one lane will remain open).

You can receive information on lane closures straight to your e-mail inbox by registering here (link to http://eepurl.com/cXz2kr). Daily updates are sent out daily for the full closures.