UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, March 15 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, March 15 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Left lane eastbound frontage road closure at US 281 for concrete work.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from the US 281 north exit ramp to the US 281 northbound frontage road.
  • Saturday, March 21 until Monday, March 23. Weekend full closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, March 21 until Monday, March 23. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, March 21 until Monday, March 23. Full Weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. Eastbound frontage road at O’Connor Road (including intersection) for pavement repair work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. Frontage road in both directions at Bulverde Road for pavement repair work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Redland Road and Green Mountain Road for guard fence replacement work and mow strip work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. Westbound frontage road between Bulverde Road and Redland Road for barrier resetting work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 am. One westbound mainlane between Redland Road and Bulverde Road for striping work.
Loop 1604 – Northwest San Antonio
  • Friday, March 13 until Saturday, March 14. 9 p.m. until 5 a.m. Westbound left mainlane between SH 16 (Bandera Road) and FM 1560 (Hausman Road) for barrier setting work.
  • Friday, March 13 until Sunday, March 15. Full weekend closure 9 a.m. until 5 p.m. Eastbound left frontage road lane between Champions Gate and FM 1560 (Hausman Road) for barrier setting work.
  • Friday, March 13 until Monday, March 16. Full weekend closure 9 p.m. until 5 a.m. Eastbound right mainlane and shoulder between SH 16 (Bandera Road) and FM 1560 (Hausman Road) including the Hausman exit ramp (2-month closure) for barrier and traffic rail work.
Loop 1604 – Far East San Antonio
  • None scheduled.
Loop 1604 – South San Antonio
  • Monday, March 9 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Eastbound mainlane at US 281 for barrier removal work.
US 281 – North Central San Antonio/Bexar County
  • Sunday, March 15 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the south- to northbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, March 16 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for soundwall work and safety enhancements.
  • Saturday, March 21 until Monday, March 23. Weekend full closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, March 21 until Monday, March 23. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, March 21 until Monday, March 23. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, March 21 until Monday, March 23. Continuous full closure 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
  • Saturday, March 21 until Monday, March 23. Continuous full closure 3 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Evans Road.
  • Saturday, March 21 until Monday, March 23. Continuous full closure 3 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Evans Road.
US 281 – South San Antonio
  • Monday, March 16 until Thursday, March 19. Daily 9 a.m. until 4 p.m. Right mainlane in both directions at FM 1937 for traffic light pole installation work.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Wednesday, March 18. Daily 9 a.m. until 3 p.m. Eastbound left frontage road lane between Two Creeks and FM 3351 (Ralph Fair Road) for drainage work.
  • Tuesday, March 3 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Westbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
  • Monday, March 9 until Friday, March 20. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between FM 3351 (Ralph Fair Road) and Buckskin Drive for drainage work.
  • Tuesday, March 10 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Eastbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
  • Monday, March 16 until Friday, March 27. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Friday, March 13 until Monday, March 16. 8 p.m. to 5 a.m. The left westbound I-10 mainlane from just east of Loop 1604 to just west of Woodlake Parkway will be closed for traffic switch activities. Following the traffic switch, two mainlanes will re-open in the median area and the existing westbound mainlanes and westbound exit ramp to FM 1516 will be closed. DETOUR: Westbound I-10 mainlane drivers needing to access FM 1516 may take either the Loop 1604 exit and travel west on the frontage road to FM 1516 or take the Ackerman Road exit, turn around, and travel back to FM 1516.
  • Monday, March 16 until Wednesday, March 18. Westbound exit ramp to Loop 1604 will be closed to finish drainage and road work. DETOUR: Westbound traffic needing to access Loop 1604 will need to exit Graytown road and continue on the westbound frontage road to Loop 1604.
  • Monday, March 16 until Friday, March 20. Daily 9 a.m. to 3 p.m. One alternating lane in each direction of Ackerman Road under I-10 for bridge construction activities.
I-10 – Central San Antonio
  • None scheduled.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Monday, March 16 until Friday, March 20. Daily 8:30 a.m. until 4 p.m. Right frontage road lane in both directions at Rittiman Road for sidewalk and curb installation work.
  • Monday, March 16 until Saturday, March 21. Daily 8:30 a.m. until 5:30 p.m. Northbound frontage road between FM 1103 and Schwab Road for sidewalk construction work.
  • Wednesday, March 18. 9 a.m. until 4 p.m. Southbound left mainlane and shoulder between Schwab Road and FM 2252 for illumination repair work.
I-37 – Central San Antonio
  • Sunday, March 15 until Tuesday, March 17. Nightly 8 p.m. until 5 a.m. Southbound right mainlane between Cesar Chavez and Boyer for new guard rail installation work.
  • Tuesday, March 17 until Friday, March 20. Nightly 8 p.m. until 5 a.m. Westbound exit ramp to I-10 westbound for new guard rail installation work..
I-410 – West San Antonio
  • Current until Saturday, March 14. Daily 9 a.m. to 3 p.m. One frontage road in both directions between SH 151 to FM 471 (Culebra Road) and the turnarounds at West Military Drive for electrical service work. DETOUR: Traffic will need to use the SH 151 and FM 471 (Culebra Road) turnarounds.
  • Friday, March 13 until Monday, March 16. Weekend 8 p.m. to 5 a.m. All southbound mainlanes between Waters Edge Drive to US 90 for mill and inlay operations. DETOUR: Traffic will take the US 90 eastbound exit to I-410 southbound frontage road.
  • Friday, March 20 until Monday, March 23. Weekend 8 p.m. to 5 a.m. All southbound mainlanes between Waters Edge Drive to US 90 for mill and inlay operations. DETOUR: Traffic will take the US 90 eastbound exit to I-410 southbound frontage road.
  • Current until Monday, March 30. Weekend 8 p.m. to 5 a.m. Two alternating lanes in each direction between SH 151 to Valley Hi Drive for mill and inlay work.
  • Current until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between US 90 bridge to SH 151 for mill and inlay work.
US 90 – West San Antonio
  • Current until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment and rock placement.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, March 16 until Friday, March 20. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, March 21. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
FM 2252 – Nacagdoches Road
  • Current until Friday, March 20. Daily 8 a.m. until 5 p.m. Eastbound right lane and shoulder between Loop 1604 and Dolente Road for sidewalk, curb and shoulder work.
FM 1560 – Hausman Road
  • Exit ramp from Loop 1604 eastbound closed for approximately two months starting Monday, March 16.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • None scheduled.
US 87 – Roland Avenue
  • Current until Sunday, March 15. Daily 9 a.m. until 4 p.m. One lane in both directions between I-10 and Rigsby Avenue for placing sod, manhole and electrical work.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • None scheduled.
Loop 337 – New Braunfels/Comal County
  • Current until Tuesday, April 7. Full-time closure. Northbound access road to Landa Street for road widening, traffic island removal, sidewalk and curb work.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
FM 2252 – Comal County
  • None scheduled.
SH 46 – Guadalupe County
  • None scheduled.
FM 78 – Guadalupe County
  • None scheduled.
FM 1518 – Schertz/Cibolo Guadalupe County
  • None scheduled.
US 90A – Seguin/Guadalupe County
  • None scheduled.
SH 123 – Seguin/Guadalupe County
  • None scheduled.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • None scheduled.
I-35 – Atascosa County/Frio County
  • Friday, March 13. 8 a.m. until 5 p.m. One northbound mainlane between FM 3175 and FM 2790 for barrier resetting work.
US 181 – Floresville/Wilson County
  • None scheduled.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Current until 7 p.m. Saturday, March 14. One lane at various locations between North School Street and Wasp Creek Road for culvert work.
  • Current until Sunday, March 15. Full time all-day closure. All lanes in both directions at Wasp Creek Road for road reconstruction work. DETOUR: Roadway open to local traffic but drivers wishing to travel between Boerne and Sisterdale will be diverted to FM 474 and FM 473.
  • Monday, March 16 until Saturday, March 21. Daily 7 a.m. until 7 p.m. One lane at various locations between North School Street and Wasp Creek Road for culvert work.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
SH 16 – McMullen County
  • Monday, March 16 until Friday, March 20. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.

Friday, March 6

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road for ramp work.
  • Sunday, March 8 until Friday, March 13. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for milling and paving work.
  • Sunday, March 1 until Monday, March 2. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
  • Sunday, March 8 until Friday, March 13. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guard rail and mow strip work.
  • Wednesday, March 4. 9 a.m. until 5 p.m. Eastbound frontage road and turnaround at FM 2252 (Nacagdoches Road) for bridge repair work.
  • Sunday, March 8 until Thursday, March 12. Nightly 9 p.m. until 5 a.m. Eastbound frontage road at O’Connor Road (including intersection) for pavement repair work.
  • Sunday, March 8 until Thursday, March 12. Nightly 9 p.m. until 5 a.m. Frontage road in both directions at Bulverde Road for pavement repair work.
  • Sunday, March 8 until Thursday, March 12. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Redland Road and Green Mountain Road for guard fence and mow strip work.
  • Thursday, March 12 until Friday, March 13. 9 p.m. until 5 a.m. Full eastbound mainlane closure between Redland Road and Bulverde Road for Overhead Sign Bridge removal work and guard fence installation work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Redland Road and Green Mountain Road for guard fence replacement work and mow strip work.
  • Sunday, March 15 until Thursday, March 19. Nightly 9 p.m. until 5 a.m. Westbound frontage road between Bulverde Road and Redland Road for barrier resetting work.
Loop 1604 – Northwest San Antonio
  • Friday, March 13 until Sunday, March 15. Full weekend closure 9 a.m. until 5 p.m. Eastbound left frontage road lane between Champions Gate and FM 1560 (Hausman Road) for barrier setting work.
  • Friday, March 13 until Monday, March 16. Full weekend closure 9 p.m. until 5 a.m. Eastbound right mainlane and shoulder between SH 16 (Bandera Road) and FM 1560 (Hausman Road) including the Hausman exit ramp (2-month closure) for barrier and traffic rail work.
Loop 1604 – Far East San Antonio
  • Friday, March 6 until Saturday, March 7. 9 p.m. until 5 p.m. Full mainlane closure in both directions between FM 1346 and Schuwirth Road for paving work. DETOUR: Loop 1604 northbound traffic diverted to FM 1346 westbound to Schuwirth Road; Loop 1604 southbound traffic diverted to Schuwirth Road to FM 1346 eastbound.
Loop 1604 – South San Antonio
  • Monday, March 9 until Friday, March 20. Nightly 9 p.m. until 5 a.m. Eastbound mainlane at US 281 for barrier removal work.
US 281 – North Central San Antonio/Bexar County
  • Saturday, March 7. 7 a.m. until 5 p.m. Southbound right mainlane at Mountain Lodge for striping work and traffic switch
  • Sunday, March 8 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full closure of the northbound-to- eastbound direct connector for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full northbound closure of the northbound-to-westbound Loop 1604 direct connector r bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, March 9 until Friday, March 13. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Saturday, March 14 until Monday, March 16. Weekend full closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, March 14 until Monday, March 16. Full weekend closure 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
  • Saturday, March 14. 7 a.m. until 5 p.m. Southbound right mainlane at Mountain Lodge for barrier setting work.
  • Monday, March 16 until Thursday, March 19. Daily 9 a.m. until 5 p.m. Southbound left mainlane at Cibolo Creek for bridge repair work.
US 281 – South San Antonio
  • None scheduled.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Wednesday, March 18. Daily 9 a.m. until 3 p.m. Eastbound left frontage road lane between Two Creeks and FM 3351 (Ralph Fair Road) for drainage work.
  • Tuesday, March 3 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Westbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
  • Monday, March 9 until Friday, March 20. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between FM 3351 (Ralph Fair Road) and Buckskin Drive for drainage work.
  • Tuesday, March 10 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Eastbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Friday, March 6 until Monday, March 9. Full weekend closure 8 p.m. to 5 a.m. Right eastbound mainlane will be closed from Woodlake Parkway to Loop 1604 as crews implement a traffic switch. Intermittent closures of the eastbound entrance ramp from Foster Road and the eastbound exit ramp to FM 1516 will also be required during the traffic switch. Following the traffic switch, the existing eastbound entrance ramp from Foster Road will be closed and a new entrance ramp will open just east of Woodlake Parkway. DETOURS: During the intermittent ramp closures, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after the Loop 1604 intersection. Drivers needing to access FM 1516 from I-10 may take the Loop 1604 exit, turn around, and travel back to FM 1516. Following the traffic switch, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after Woodlake Parkway.
I-10 – Central San Antonio
  • Wednesday, March 11 until Thursday, March 12. 8 p.m. until 5 a.m. Westbound exit ramp to I-37 southbound for guard rail and illumination work.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Monday, March 9 until Friday, March 13. Daily 8:30 a.m. until 4 p.m. Right frontage road lane in both directions at Rittiman Road (including right-turn lane from Rittiman to the frontage road and right-turn from frontage road to Rittiman) for sidewalk and curb installation work.
  • Monday, March 9 until Friday, March 13. Daily 8:30 a.m. until 4 p.m. Right frontage road lane in both directions at Eisenhauer Road (including right-turn lane from Eisenhauer to frontage road and right turn from frontage Road to frontage road) for sidewalk and curb installation work.
  • Tuesday, March 10 until Wednesday, March 11. 9 p.m. until 5 a.m. Northbound center and left mainlanes between Schwab Road and Hubertus Road for striping removal work.
  • Tuesday, March 10 until Wednesday, March 11. 8 p.m. until 5 p.m. Southbound exit ramp to I-10 eastbound for guard rail installation work.
  • Wednesday, March 11. 9 a.m. until 4 p.m. Southbound right mainlane between North Walters Street and New Braunfels Avenue (including entrance ramps before AT&T Center Parkway & after New Braunfels Avenue) for landscaping work.
I-37 – Central San Antonio
  • Monday, March 9 until Tuesday, March 10. 8 p.m. until 5 a.m. Southbound exit ramp to I-10 westbound for guard rail work.
  • Thursday, March 12 until Friday, March 13. 8 p.m. until 5 a.m. Northbound right mainlane and shoulder at Florida Street/Carolina Street exit ramp for guard rail work.
I-410 – West San Antonio
  • Current until Monday, March 9. Full weekend closure 8 p.m. to 5 a.m. Two left mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for concrete barrier work.
  • Friday, March 6 until Monday, March 30. Weekend 8 p.m. to 5 a.m. Two alternating lanes in each direction between SH 151 to Valley Hi Drive for mill and inlay work.
  • Monday, March 9 until Friday, March 13. Daily 7 a.m. to 5 p.m. The northbound exit ramp to Marbach Road for mill and inlay work. DETOUR: Traffic will be detoured to the exit SH 151 and turnaround.
  • Current until Saturday, March 14. Daily 9 a.m. to 3 p.m. One frontage road in both directions between SH 151 to FM 471 (Culebra Road) and the turnarounds at West Military Drive for electrical service work. DETOUR: Traffic will need to use the SH 151 and FM 471 (Culebra Road) turnarounds.
  • Current until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between US 90 bridge to SH 151 for mill and inlay work.
US 90 – West San Antonio
  • Sunday, March 8 until Friday, March 13. Nightly 8 p.m. to 5 a.m. The eastbound exit to Ray Ellison Drive to the I-410 direct connector ramp for painting the connector ramp. DETOUR: Traffic will be detoured to exit at Ray Ellison, stay on the frontage road to access the east to northbound cloverleaf; continue on the I-410 frontage road and use the next entrance ramp for I-410 northbound.
  • Monday, March 9 until Friday, March 13. Daily 7 a.m. to 5 p.m. Two westbound frontage road lanes between Observation Drive (US 90) and Landing Avenue (I-410) for mill and inlay work. DETOUR: Traffic will be detoured to use cloverleafs to access frontage road.
  • Current until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment and rock placement.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, March 9 until Friday, March 13. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, March 14. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
FM 2252 – Nacagdoches Road
  • Current until Friday, March 20. Daily 8 a.m. until 5 p.m. Eastbound right lane and shoulder between Loop 1604 and Dolente Road for sidewalk, curb and shoulder work.
FM 1560 – Hausman Road
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • Sunday, March 8 until Friday, March 13. Nightly 9 p.m. to 5 a.m. One lane in each direction between Billy Mitchell to US 90 for mill and paving work.
US 87 – Roland Avenue
  • Current until 4 p.m. Saturday, March 7. Alternating lanes in both directions between Rigsby Avenue and Super 8 for paving, sod placement, manhole and sign installation work.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • Friday, March 6. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
  • Monday, March 9. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
Loop 337 – New Braunfels/Comal County
  • Tuesday, March 10 until Tuesday, April 7. Full-time closure. Northbound access road to Landa Street for road widening, traffic island removal, sidewalk and curb work.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
FM 2252 – Comal County
  • None scheduled.
SH 46 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
FM 78 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
FM 1518 – Schertz/Cibolo Guadalupe County
  • None scheduled.
US 90A – Seguin/Guadalupe County
  • None scheduled.
SH 123 – Seguin/Guadalupe County
  • None scheduled.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • None scheduled.
I-35 – Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • None scheduled.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Saturday, March 7 until Sunday, March 15. Full time all-day closure. All lanes in both directions at Wasp Creek Road for road reconstruction work. DETOUR: Roadway open to local traffic but drivers wishing to travel between Boerne and Sisterdale will be diverted to FM 474 and FM 473.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
SH 16 – McMullen County
  • Monday, March 9 until Friday, March 13. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.

Friday, February 28

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
  • Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road for ramp work.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for milling and paving work.
  • Sunday, March 1 until Monday, March 2. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guard rail and mow strip work.
  • Wednesday, March 4. 9 a.m. until 5 p.m. Eastbound frontage road and turnaround at FM 2252 (Nacagdoches Road) for bridge repair work.
Loop 1604 – Northwest San Antonio
  • Saturday, February 29. 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for laying asphalt work.
US 281 – North Central San Antonio
  • Saturday, February 29. 7 a.m. until 5 p.m. Southbound right mainlane between Bulverde Road and Marshall Road for barrier setting work.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
  • Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
  • Saturday, March 7 until Monday, March 9. Weekend full closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, March 7 until Monday, March 9. Weekend full closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, March 7 until Monday, March 9. Continuous 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
US 281 – Southeast San Antonio
  • None scheduled.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Sunday, March 1 until Monday, March 2. 9 p.m. until 5 a.m. Eastbound left mainlane between Fair Oaks Parkway and Balcones Creek (Bexar/Kendall county line) for barrier removal work.
  • Tuesday, March 3 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Westbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
  • Tuesday, March 10 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Eastbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Monday, March 2. Beginning at 5 a.m. Frontage road configuration conversion between Graytown Road to Pfeil Road from two-way traffic to one-way traffic in both directions. DETOUR: Drivers wishing to access westbound I-10 will continue traveling east to Pfeil Road and turn around. Drivers wishing to access the eastbound I-10 mainlanes will continue east to the next entrance ramp; drivers wishing to access eastbound I-10 will continue traveling west to Loop 1604 and turn around. Drivers wishing to access the westbound I-10 mainlanes will continue west to the next entrance ramp.
  •  Friday, March 6 until Monday, March 9. Full weekend 9 p.m. to 5 a.m. One alternating eastbound mainlane will be closed from Foster Road to Loop 1604 as crews implement a traffic switch. Intermittent closures of the eastbound entrance ramp from Foster Road will also be required. Following the traffic switch, the existing eastbound entrance ramp from Foster Road will be closed and a new entrance ramp will open just east of Woodlake Parkway. DETOURS: During the intermittent ramp closures, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after the Loop 1604 intersection. Following the traffic switch, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after Woodlake Parkway.
I-10 – Central San Antonio
  • None scheduled.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Sunday, March 1 until Wednesday, March 4. Nightly 9 p.m. until 5 a.m. Two northbound mainlanes at Weidner Road for milling and inlay work.
  • Monday, March 2 until Wednesday, March 6. Daily 9 a.m. until 3 p.m. Northbound right mainlane between SH 46 entrance ramp and Business 35 exit ramp for guard rail installation work.
  • Monday, March 2 until Saturday, March 7. Daily 8:30 a.m. until 5:30 p.m. Northbound frontage road between Schwab Road and Hubertus Road for sidewalk work.
  • Wednesday, March 4 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Two northbound mainlanes between O’Connor Road and Judson Road for milling and inlay work.
I-37 – Central San Antonio
  • Sunday, March 1 until Wednesday, March 4. Nightly 8 p.m. until 5 a.m. Southbound right mainlane between Florida/Carolina exit and Drexel Avenue overpass for new guard rail installation work.
  • Wednesday, March 4 until Friday March 6. Nightly 8 p.m. until 5 a.m. Southbound right mainlane between Cesar Chavez Avenue and Florida/Carolina exit for new guard rail installation work.
I-410 – West San Antonio
  • Current until Monday, March 9. Full weekend closure 8 p.m. to 5 a.m. Two left mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for concrete barrier work.
  • Monday, March 2 until Saturday, March 14. Daily 9 a.m. to 3 p.m. One frontage road in both directions between SH 151 to FM 471 (Culebra Road) and the turnarounds at West Military Drive for electrical service work. DETOUR: Traffic will need to use the SH 151 and FM 471 (Culebra Road) turnarounds.
  • Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between US 90 bridge to SH 151 for mill and inlay work.
US 90 – West San Antonio
  • Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment and rock placement.
  • Monday, March 2 until Thursday, March 5. Nightly 8 p.m. to 5 a.m. The right eastbound mainlane between Springvale Drive to Hunt Lane for single slope traffic rail work.
  • Thursday, March 5 until Saturday, March 7. Nightly 8 p.m. to 5 a.m. The right westbound mainlane between Springvale Drive to Hunt Lane for single slope traffic rail work.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, March 2 until Friday, March 6. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, March 7. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
FM 1560 – Hausman Road
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • Sunday, March 1 until Friday, March 6. Nightly 9 p.m. to 5 a.m. One lane in each direction between Billy Mitchell to US 90 for mill and paving work.
US 87 – Roland Avenue
  • Current until Saturday, March 7. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions between Rigsby Avenue and Super 8 for paving, sod placement, manhole and sign installation work.
  • Sunday, March 1 until Monday, March 2. 9 p.m. until 5 a.m. One lane in both directions between Rigsby Avenue and I-10 for striping work.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • Friday, March 6. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
  • Monday, March 9. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
FM 2252 – Comal County
  • Sunday, March 1 until Friday, March 6. Daily 9 a.m. until 4 p.m. One lane in both directions between Evans Road and Judson Road for milling and paving work.
SH 46 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
FM 78 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
FM 1518 – Schertz/Cibolo Guadalupe County
  • None scheduled.
US 90A – Seguin/Guadalupe County
  • None scheduled.
SH 123 – Seguin/Guadalupe County
  1. None scheduled.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • None scheduled.
I-35 – Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • None scheduled.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Saturday, March 7 until Sunday, March 15. Full time all-day closure. All lanes in both directions at Wasp Creek Road for road reconstruction work. DETOUR: Roadway open to local traffic but drivers wishing to travel between Boerne and Sisterdale will be diverted to FM 474 and FM 473.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
SH 16 – McMullen County
  • Monday, March 2 until Friday, March 6. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.

Wednesday, February 26

Ramping It Up: New Exit To Bulverde Road On Loop 1604

Important developments on one our projects on Loop 1604!

As any of y'all that frequently drive Loop 1604 in the North Central/Northeast San Antonio area likely have seen, one of our contractors has been working on a ramp reversal project between Bulverde Road and Redland Road.

We're making good progress on this project, which entails a total of four ramps (two on the eastbound side and two in the westbound direction).

Tonight (Wednesday 2/26) following barrier resetting work overnight, there will be a new eastbound exit ramp to Bulverde Road opening up to the traveling public.

At the same time, the current exit ramp closer to Bulverde will be closing so work can begin on converting it to a new entrance ramp.

Still remaining on this project are a new westbound exit ramp (underway) as well as a new eastbound entrance ramp. Lastly, there will be a mill and overlay (cutting out the top layer and laying on a new top) of the Loop 1604 mainlanes between Redland Road and Green Mountain Road (an adjacent but separate project is doing the same work between Green Mountain Road and I-35).

The main reason behind this ramp reversal project is to alleviate traffic congestion as well as in preparation for the new configuration under the future Loop 1604 expansion project, which will ultimately upgrade the highway all across the North side from SH 16 (Bandera Road) to I-35. That project is expected to begin construction next year.



Friday, February 21

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
  • Saturday, February 29 until Monday, March 2. Full weekend full 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
  • Sunday, February 23 until Thursday, February 27. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road for ramp work.
  • Sunday, February 23 until Friday, February 28. Daily 9 a.m. until 3 p.m. One mainlane in both directions between Green Mountain Road and I-35 for milling and paving work.
  • Sunday, February 23 until Thursday, February 27. Nightly 9 p.m. until 5 a.m. Eastbound frontage road at Green Mountain Road/Redland Road exit for ramp work.
  • Sunday, February 23 until Monday, March 2. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
  • Sunday, February 23 until Friday, February 28. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guard rail and mow strip work.
  • Tuesday, February 25 until Thursday, February 27. Nightly 9 p.m. until 5 a.m. Left frontage road lane in both directions at Bulverde Road for pavement repair work.
  • Tuesday, February 25 until Thursday, February 27. Nightly 9 p.m. until 5 a.m. Eastbound left frontage road lane at O'Connor Road for pavement repair work.
Loop 1604 – Northwest San Antonio
  • Monday, February 24 until Friday, February 28. Daily 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for asphalt work.
US 281 – North Central San Antonio
  • Saturday, February 22. 7 a.m. until 5 p.m. Southbound right mainlane between Bulverde Road and Marshall Road for barrier setting work.
  • Sunday, February 23 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Sunday, February 23 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the entrance ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Monday, February 24 until Friday, February 28. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, February 29 until Monday, March 2. Full weekend closure 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
US 281 – Southeast San Antonio
  • None scheduled.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Friday, February 28. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
  • Current until Friday, February 28. Daily 9 a.m. until 3 p.m. One westbound frontage road lane between Camp Bullis Road and Boerne Stage Road for rip rap work.
  • Tuesday, February 25 until Friday, February 28. Daily 9 a.m. until 3 p.m. Southbound left frontage road lane between FM 3351 (Ralph Fair Road) and Boerne Stage Road for water quality pond work.
  • Wednesday, February 26 until Thursday, February 27. 9 a.m. until 5 p.m. Westbound right mainlane at Cibolo Creek (Boerne) for bridge maintenance work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Saturday, February 22, 9 a.m. to Monday, February 24, 6 a.m. The northbound and southbound turning movements on Foster Road to the eastbound frontage road will be closed to construct the intersection. DETOUR: Eastbound frontage road traffic will be detoured to Ackerman Road.
  • Sunday, February 23 until Friday, February 28. Nightly 9 p.m. to 5 a.m. One right mainlane from Loop 1604 to Pfeil Road for barrier and crash cushion installation.
  • Monday, February 24. 12 a.m. to 5 a.m. Woodlake Parkway in both directions under I-10 for bridge construction activities. DETOUR: Northbound Woodlake Parkway traffic will take the eastbound I-10 frontage road and turn around at FM 1516. Southbound Woodlake Parkway traffic will take the westbound I-10 frontage road and turn around at Foster Road.
I-10 – Central San Antonio
  • Wednesday, February 26 until Friday, February 28. Nightly 8:30 p.m. until 5 a.m. One westbound mainlane at I-37 interchange (including westbound exit ramp to I-37) for guard rail installation work.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Monday, February 24 until Friday, February 28. Daily 8:30 a.m. until 4 p.m. Northbound right frontage road lane at Rittiman Road (including dedicated right-turn lane from Rittiman to frontage road) for sidewalk and curb installation work. DETOUR: Traffic diverted to the George Beach turnaround to get back on I-35 northbound frontage road.
  • Monday, February 24 until Friday, February 28. Daily 8:30 a.m. until 4 p.m. Right frontage road lane in both directions at Eisenhauer Road (including dedicated right-turn lane from Eisenhauer to frontage road) for sidewalk and curb installation work.
I-35 -- Southern Region
  • Tuesday, February 25 until Wednesday, February 26. Daily 8 a.m. until 5 p.m. Alternating mainlanes in both directions between FM 2790 and Bexar/Atascosa county line for barrier resetting work.
I-37 – Central San Antonio
  • Sunday, February 23 until Wednesday, February 26. Nightly 8:30 p.m. until 5 a.m. One westbound mainlane at I-10 interchange (including eastbound exit ramp to I-10) for guard rail installation work.
  • Thursday, February 27. 9 a.m. until 3 p.m. One southbound mainlane at I-10 interchange (including I-37 southbound exit ramp to I-10) for guard rail repair work and illumination pole installation work.
I-410 – West San Antonio
  • Friday, February 21 until Monday, March 9. Full weekend closure 8 p.m.to 5 a.m. Two mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for concrete barrier work.
  • Tuesday, February 25. 9 a.m. until 3 p.m. Southbound left frontage road lane between Marbach Road and US 90 for milling and inlay work.
  • Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between US 90 bridge and SH 151 for mill and inlay work.
US 90 – West San Antonio
  • Sunday, February 23 until Friday, February 28. Nightly 8 p.m. to 5 a.m. All westbound frontage road lanes at the exit ramp to Hunt Lane and the exit ramp for removing concrete barrier and opening the new westbound mainlane exit ramp. DETOUR: Traffic will take the south and eastbound cloverleafs and turnaround at W. Military Drive.
  • Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment and rock placement.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road 
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, February 24 until Friday, February 28. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, February 29. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • Tuesday, February 25 until Wednesday, February 26. 9 p.m. until 4 a.m. One lane in both directions between FM 2696 (Blanco Road) and West Avenue for geotechnical work.
FM 1560 – Hausman Road
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • Sunday, February 23 until Friday, February 28. Nightly 9 p.m. to 5 a.m. One lane in each direction between Billy Mitchell to US 90 for mill and paving work.
US 87 – Roland Avenue
  • Current until Monday, March 2. Nightly 9 p.m. until 5 a.m. Southbound lanes between Rigsby Avenue and I-10 for milling work
  • Sunday, February 23 until Saturday, March 7. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions between Rigsby Avenue and Super 8 for paving, sod placement, manhole and sign installation work.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • Current until Tuesday, February 25. Daily 9 a.m. until 2 p.m.  Full closure of Boerne Stage Road in both directions at I-10 for concrete panel installation work.
  • Tuesday, March 3 until Wednesday, March 4. Continuous 4 a.m. until 3 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
FM 2673 – Canyon Lake/Comal County
  • None scheduled.
SH 46 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
FM 78 – Guadalupe County
  • Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
FM 1518 – Schertz/Cibolo Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between Main Street and Oak Street for driveway, curb and sidewalk work.
  • Current until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between Main Street and Oak Street for sidewalk, curb and driveway installation work.
US 90A – Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between SH 123 and FM 466 for driveway, curb and sidewalk work.
  • Current until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions between SH 123 and FM 466 for sidewalk, curb and driveway installation work.
SH 123 – Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Southbound right lane at FM 466 for driveway, curb and sidewalk work.
  • Current until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between FM 466 and Joe Carrillo for driveway, curb and sidewalk installation work.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Alternating lanes in both directions between Tor Drive and FM 725 for driveway, curb and sidewalk work.
  • Current until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions (flagging operations) between Tor Drive and Spring Street for sidewalk, curb and driveway installation work.
I-35 – Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions at SH 97 for driveway, curb and sidewalk work.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Current until 7 p.m. Saturday, February 22. Alternating lanes in both directions between North School Street and Wasp Creek Road for culvert work.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
SH 16 – McMullen County
  • Monday, February 24 until Friday, February 28. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.

Friday, February 14

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
  • Saturday, February 16 until Friday, February 21. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 (as well as entrance/exit ramps in between) for guard rail and mow strip work.
  • Monday, February 10 until Friday, February 14. Daily 9 a.m. until 3 p.m. One mainlane in both directions between Green Mountain Road and I-35 (as well as entrance/exit ramps in between) for mow strip work.
  • Monday, February 17 until Thursday, February 20. Nightly 9 p.m. until 5 a.m. One eastbound mainlane and one frontage road lane between Redland Road and Bulverde Road for barrier resetting and ramp work.
  • Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Two frontage road lanes in both directions at Bulverde Road (including intersection under the highway) for pavement repair work.
  • Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Two eastbound frontage road lanes at O’Connor Road (including intersection under the highway) for pavement repair work.
  • Monday, February 17 until Friday, February 21. Daily 9 a.m. until 3 p.m. One mainlane in both directions between Green Mountain Road and I-35 for mow strip work.
  • Wednesday, February 19 until Monday, February 24. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
Loop 1604 – Northwest San Antonio
  • Monday, February 17 until Friday, February 21. Daily 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for asphalt work.
US 281 – North Central San Antonio
  • Friday, February 14 until Saturday, February 15. 9 p.m. until 5 p.m. Right southbound mainlane closure from Stone Oak/Tournament Players Club (TPC) Parkway to Evans Road for miscellaneous concrete work.
  • Friday, February 14 until Saturday, February 15. 9 p.m. until 5 p.m. Right southbound frontage road closure from Sonterra Boulevard to Loop 1604 for miscellaneous concrete work.
  • Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left northbound mainlane closure from Encino Commons to Stone Oak/Tournament Players Club (TPC) Parkway for beam setting work.
  • Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left southbound mainlane closure from Marshall Road to Stone Oak/Tournament Players Club (TPC) Parkway for beam setting work.
  • Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for beam setting work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for beam setting work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road and turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on to the entrance ramp.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
  • Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, February 22 until Monday, February 24. 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
US 281 – Southeast San Antonio
  • Current until 5 p.m. Saturday, February 15. Alternating mainlanes in both directions at FM 1937 for mill and overlay work.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Current until Friday, February 28. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
  • Current until Friday, February 28. Daily 9 a.m. until 3 p.m. One westbound frontage road lane between Camp Bullis Road and Boerne Stage Road for rip rap work.
  • Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Westbound right mainlane between Dominion Drive and Boerne Stage Road for junction box installation work.
  • Monday, February 17 until Friday, February 21. Daily 9 a.m. until 4 p.m. Frontage road intersection at SH 46 in both directions (including dedicated right-turn lane from SH 46 to the frontage road) for traffic island removal and asphalt work.
  • Tuesday, February 18 until Thursday, February 20. Daily 9 a.m. until 5 p.m. Westbound right mainlane at Cibolo Creek (Boerne) for bridge maintenance work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Sunday, February 16 until Friday, February 21. Nightly 9 p.m. to 5 a.m. One right mainlane in both directions between Loop 1604 and Pfeil Road for barrier and crash cushion installation.
  • Wednesday, February 19. 9 a.m. to 3 p.m. The east to westbound turnaround will be closed at Foster Road to pour foundation for a signal pole. DETOUR: Eastbound frontage road traffic needing to use the turnaround will turn left on Foster Road and then left on the westbound frontage road.
  • Thursday, February 20 until Friday, February 21. 8 p.m. to 5 a.m. Woodlake Parkway in both directions under I-10 for bridge construction activities. DETOUR: Northbound Woodlake Parkway traffic will take the eastbound I-10 frontage road and turn around at FM 1516. Southbound Woodlake Parkway traffic will take the westbound I-10 frontage road and turn around at Foster Road.
  • Saturday, February 22. 5 a.m. to 9 p.m. One right mainlane in both directions between Loop 1604 and Pfeil Road for barrier and crash cushion installation.
I-10 – Central San Antonio
  • None scheduled.
I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County
  • Monday, February 17 until Friday, February 21. Daily 8:30 a.m. until 4 p.m. Northbound right frontage road lane at Rittiman Road (including dedicated right-turn lane from Rittiman to frontage road) for sidewalk and curb installation work.
  • Monday, February 17 until Friday, February 21. Daily 8:30 a.m. until 4 p.m. Northbound right frontage road lane at Eisenhauer Road (including dedicated right-turn lane from Eisenhauer to frontage road) for sidewalk and curb installation work.
I-410 – West San Antonio
  • Friday, February 14 until Saturday, February 15. Nightly 10 p.m. to 5 a.m. The southbound to westbound connector to US 90 for illumination pole work. DETOUR: Traffic will be detoured to the frontage road.
  • Friday, February 14 until Saturday, February 15. Nightly 10 p.m. to 5 a.m. The left southbound frontage road between Demya Drive to Bertetti for illumination pole work.
  • Friday, February 14 until Monday, February 17. Weekend 8 p.m. to 5 a.m. All mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for overhead sign bridge column and striping work. DETOUR: Traffic will be detoured to the frontage road and re-enter at the next entrance.
US 90 – West San Antonio
  • Sunday, February 16 until Friday, February 21. Nightly 8 p.m. to 5 a.m. All westbound frontage road lanes at the exit ramp to Hunt Lane and the exit ramp for rail work. DETOUR: Traffic will take the south and eastbound cloverleafs and turnaround at W. Military Drive.
  • Sunday, February 16 until Friday, February 21. Nightly 8 p.m. to 5 a.m. The right westbound mainlane between the new US 90 exit to Hunt Lane for concrete barrier and striping work.
SH 16 – Bandera Road
  • None scheduled.
FM 3351 – Ralph Fair Road
  • None scheduled.
PA 1502 – Wurzbach Parkway
  • Monday, February 17 until Tuesday, February 19. 9 p.m. until 3 a.m. Eastbound right lane between FM 2696 (Blanco Road) and West Avenue for geotechnical work.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, February 17 until Friday, February 21. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, February 22. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
FM 1560 – Hausman Road
  • None scheduled.
FM 1516 – South Seguin Road/Converse
  • None scheduled.
SH 218 – Pat Booker Road
  • None scheduled.
Spur 371 – General Hudnell Drive
  • None scheduled.
US 87 – Roland Avenue
  • Monday, February 17 until Monday, March 2. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions between Rigsby Avenue and I-10 for paving, sod placement and sign installation work.
  • Monday, February 17 until Monday, March 2. Nightly 9 p.m. until 5 a.m. Southbound lanes between Rigsby Avenue and I-10 for milling work.
Spur 421 – Bandera Road
  • None scheduled.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 353 – New Laredo Highway
  • None scheduled.
Other Roads – Bexar County
  • Current until Thursday, February 20. Daily 7 a.m. until 5 p.m. All lanes of Meadowland Drive at Loop 1604 southbound for grading and paving work.
  • Saturday, February 15. 7 a.m. until 3 p.m. Full closure of Wilderness Oak between Summer Glen and US 281 for a traffic switch.
  • Monday, February 17 until Thursday, February 20. Daily 9 a.m. until 3 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge concrete panel installation work. DETOUR: Westbound traffic diverted to the Old Fredericksburg Road turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
FM 2673 – Canyon Lake/Comal County
  • Saturday, February 15 until Sunday, February 16. 7 a.m. until 6 p.m. Eastbound lane (flagging operations) between Sattler Road and Island View Road for milling and inlay work.
  • Monday, February 17 until Friday, February 21. 7 a.m. until 6 p.m. Eastbound lane (flagging operations) between Island View Drive and River Road for milling and inlay work.
SH 46 – Guadalupe County
  • Monday, February 17 until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
FM 78 – Guadalupe County
  • Monday, February 17 until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
FM 1518 – Schertz/Cibolo Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between Main Street and Oak Street for driveway, curb and sidewalk work.
  • Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between Main Street and Oak Street for sidewalk, curb and driveway installation work.
US 90A – Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between SH 123 and FM 466 for driveway, curb and sidewalk work.
  • Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions between SH 123 and FM 466 for sidewalk, curb and driveway installation work.
SH 123 – Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Southbound right lane at FM 466 for driveway, curb and sidewalk work.
  • Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between FM 466 and Joe Carrillo for driveway, curb and sidewalk installation work.
Business 123 – South Austin Street/Seguin/Guadalupe County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Alternating lanes in both directions between Tor Drive and FM 725 for driveway, curb and sidewalk work.
  • Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions (flagging operations) between Tor Drive and Spring Street for sidewalk, curb and driveway installation work.
I-35 – Frio County
  • None scheduled.
US 181 – Floresville/Wilson County
  • Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions at SH 97 for driveway, curb and sidewalk work.
US 87 – Wilson County
  • None scheduled.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
RM/FM 1376 – Kendall County
  • Current until 7 p.m. Saturday, February 15. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions between US 87 and Wasp Creek for culvert work.
  • Monday, February 17 until Saturday, February 22. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions between North School Street and Wasp Creek Road for culvert work.
FM 1333 – Atascosa County
  • Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
FM 140 – Atascosa County
  • Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
SH 16 – McMullen County
  • Monday, February 17 until Friday, February 21. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.