Showing posts with label construction; traffic;. Show all posts
Showing posts with label construction; traffic;. Show all posts

Wednesday, April 22

Weekend Traffic Switch of the Southbound US 281 Frontage Road and Closure of Agora Palms Drive Access to the Southbound US 281 Frontage Road


We will be switching traffic from the outside to the newly built inside lane of the southbound US 281 frontage road between Agora Palms Drive and the US 281 Sonterra Boulevard access ramp from 5 a.m. to 5 p.m. Saturday, April 25. This will allow us to continue improving the southbound US 281 frontage road.
During this time, eastbound access from Agora Palms Drive to the southbound US 281 frontage road will be closed for intersection reconstruction. Traffic detouring to the southbound US 281 frontage road will head west on Agora Palms Drive, turn left on Hardy Oak Boulevard, turn left on Sonterra Boulevard and turn left onto the US 281 access ramp to return to the southbound US 281 frontage road. 
Please note that construction is weather permitting and subject to change.

You can stay informed of lane closures by receiving alerts to your email by registering here (link to http://eepurl.com/cXz2kr) or by following us on our Twitter feed (@TxDOTSanAntonio).

Friday, December 7

UPCOMING CONSTRUCTION-RELATED CLOSURES

**ALL CLOSURES WEATHER PERMITTING**

I-10 – East San Antonio
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604. 
  • Saturday, December 8, 5 a.m. until 9 p.m. Left eastbound mainlane between I-410 and Foster Road for barrier installation work. 
  • Saturday, December 8, 5 a.m. until 9 p.m. Left westbound mainlane between FM 1516 and Martinez Creek and between Foster Road and I-410 for barrier installation work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Left eastbound mainlane between I-410 and Rosillo Creek (just west of Foster Road) for construction vehicle access to/from work site. 
  • Sunday, December 9 until Friday, December 14. Nightly 7 p.m. until 5 a.m. Left westbound mainlane closure between Rosillo Creek (just west of Foster Road) and I-410 for construction vehicle access to/from work site. 
  • Friday, December 14 until Saturday, December 15. 9 p.m. until 9 p.m. Full westbound mainlane closure at FM 1516 for road repair work. DETOUR: Westbound traffic will take the FM 1516 exit, remain on the frontage road through the intersection and reenter the mainlanes west of FM 1516. 
I-10 – West San Antonio
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Westbound right mainlane from Camp Bullis Road to La Cantera Parkway for barrier removal work. 
  • Friday, December 7 until Monday, December 10. Nightly 9 p.m. until 5 a.m. Right westbound mainlane from Parkway Drive to US 87 for shoulder work. 
  • Monday, December 10 until Tuesday, December 11. 9 p.m. until 5 a.m. Right mainlane in both directions from Fair Oaks Parkway to Ralph Fair Road for barrier shifting and removal work. 
  • Tuesday, December 11 until Wednesday, December 12. Daily 9 a.m. until 4 p.m. Westbound right mainlane from US 87 to SH 46 for beam installation at Menger Creek. 
  • Tuesday, December 11 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Right mainlane in both directions from Fair Oaks Parkway to Ralph Fair Road for barrier shifting and removal work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
  • Monday, December 17 until Friday, December 21. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlanes from US 87 to Frederick Creek for barrier installation work. 
I-35 – Northeast San Antonio
  • Tuesday, December 11. 9 a.m. until 4 p.m. Southbound right mainlane from Eisenhauer Road to Rittiman Road for crash cushion repair work. 
  • Tuesday, December 11. 9 a.m. until 4 p.m. Northbound right mainlane from Rittiman Road to Eisenhauer Road for crash cushion repair work. 
I-410 – West San Antonio 
  • Current until Thursday, December 13. Daily 9 a.m. until 3 p.m. Left southbound frontage road lane from Waters Edge Road to Marbach Road for retaining wall work. 
  • Sunday, December 9 until Friday, December 14. Nightly 8 p.m. until 5 a.m. and daily 9 a.m. to 3 p.m. Northbound frontage road at Marbach Road for trench work. 
  • Tuesday, December 11. 9 a.m. until 4 p.m. Right westbound mainlane at Harry Wurzbach for road repair work. 
  • Current until Friday, December 14. Daily 8 p.m. until 5 a.m. Full northbound mainlane and frontage road closure from US 90 to Marbach to install light poles. 
  • Current until Friday, December 14. Daily 8 p.m. until 5 a.m. Full southbound mainlane and frontage road closure from US 90 to Valley Hi for overhang removal and direct connector work. 
Loop 1604 – West San Antonio
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 3 p.m. Northbound right mainlaine from Reed Road to Military Drive for curb and sidewalk work. 
  • Monday, December 10 until Friday, December 14. 9 a.m. until 3 p.m. Southbound right mainlane from Potranco Road to Walmart for damaged guard rail fence repair work. 
  • Monday, December 10 until Saturday, December 15. Daily 9 a.m. until 3 p.m. Alternating northbound mainlanes from US 90 to Dove Canyon for guard rail installation work. 
Loop 1604 – North San Antonio
  • Saturday, December 8 until Monday, December 10. Nightly 2 a.m. until 5 a.m. Full closure of westbound frontage road from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Westbound left mainlane from US 281 northbound exit to Stone Oak Parkway exit for guard fence installation work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Eastbound left mainlane from Stone Oak Parkway to Gold Canyon Road exit for guard fence installation work. 
  • Monday, December 10 until Monday, December 14. Nightly 9 p.m. until 5 a.m. Full closure of eastbound mainlanes from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
  • Monday, December 10 until Monday, December 14. Nightly 9 p.m. until 5 a.m. Full closure of westbound frontage road from Gold Canyon Road to US 281 northbound frontage road for direct connector work. 
Loop 1604 – Northeast San Antonio
  • Tuesday, December 11 until Thursday, December 13. Nightly 9 p.m. until 5 a.m. Southbound exit ramp to FM 1976 between Kitty Hawk Road and FM 78 for barrier placement work. DETOUR: Traffic will make a U-Turn at Kneupper Road, then follow Loop 1604 northbound to exit at FM 1976. 
US 281 – North San Antonio 
  • Current until Monday, December 10. Nightly 3 a.m. until 5 a.m. Southbound Sonterra Boulevard entrance ramp for retaining wall demolition work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Frontage Road to Sonterra Boulevard for direct connector work. 
  • Monday, December 10 until Tuesday, December 11. 9 p.m. until 5 a.m. Right northbound mainlane from Redland Road to Encino Rio for culvert wall work. 
  • Saturday, December 8 until Monday, December 10. Nightly 3 a.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Northbound Sonterra Boulevard exit ramp for direct connector work. 
  • Monday, December 10 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from Frontage Road to Sonterra Boulevard for direct connector work. 
  • Sunday, December 9 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlanes from Stone Oak/TPC Parkway to Marshall Road for restriping work. 
  • Tuesday, December 11 until Thursday, December 13. Alternating southbound frontage road lanes from Sonterra Boulevard to Loop 1604 westbound frontage road for restriping work. 
US 90 – West San Antonio
  • Current until Friday, December 14. Nightly 8 p.m. until 5 a.m. Full closure of eastbound mainlanes from Ray Ellison Drive to I-410 for direct connector work. DETOUR: Traffic diverted onto frontage road to then access the mainlanes. 
  • Current until Monday, December 15. Nightly 8 p.m. until 5 a.m. Full closure of westbound mainlanes and frontage road from I-410 to Horal Street for direct connector work. DETOUR: Traffic diverted onto frontage road to then access the mainlanes. 
  • Current until Thursday, December 13. Daily 9 a.m. to 3 p.m. Left westbound frontage road lane from Horal Street to Hunt Lane for retaining wall work. 
  • Sunday, December 9 until Monday, December 10. 9 p.m. until 5 a.m. Right eastbound mainlane from Loop 1604 to Medio Creek for barrier installation work. 
  • Monday, December 10. 9 a.m. until 3 p.m. Right westbound mainlane from I-410 to Military Drive for barrier work. NOTE: Work will be underneath pedestrian bridge and westbound Military entrance ramp and westbound I-410 exit ramp will remain open. 
SH 16 – Bandera Road
  • Sunday, December 8 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Southbound right lane and right turn lane from Cooter Brown to Chili’s for reconstruction of right-turn island. 
  • Sunday, December 8 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Northbound right lane and right turn lane from Academy to 7-11 for reconstruction of right-turn island. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Two southbound lanes from Legend Trail to Chili’s for Overhead Sign Bridge work. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Full northbound closure from Quincy Lee to HEB for Overhead Sign Bridge work. 
  • Wednesday, December 12 until Friday, December 14. Nightly 9 p.m. until 5 a.m. Two southbound lanes from HEB to Quincy Lee for Overhead Sign Bridge work. 
Loop 1346 – E. Houston St.
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Westbound right lane from Flora to WW White for sidewalk and driveway work. 
US 87 – Rigsby Road
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Eastbound right lane from Tucker Road to Bermuda for sidewalk and driveway work. 
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. until 4 p.m. Eastbound right lane from Bonair Road to Loop 13 (Military Drive) for sidewalk and driveway work. 
FM 1937
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. to 5 p.m. Full northbound closure from Loop 1604 to FM 3499 for drainage work. 
FM 3499
  • Monday, December 10 until Friday, December 14. Daily 9 a.m. to 5 p.m. Full northbound closure from Loop 1604 to FM 1937 for drainage work. 
Other roads – Bexar County
  • Current until Friday, December 21. Nightly 9 p.m. until 5 a.m. Both directions of Kilmarnoch Lane from Bonny Brae Lane to Loop 1604 for construction work. 
  • Current until Saturday, December 15. Daily 9 a.m. until 5 p.m. Both directions of Reed Road between Copperfield Road to Loop 1604 northbound for road work. 
  • Saturday, December 8 until Monday, December 10. Nightly 3 a.m. until 5 a.m. Westbound and eastbound Encino Commons at US 281 for drainage work. 
  • Thursday, December 13 until Friday, December 14. 9 p.m. until 5 a.m. Wiseman Boulevard in both directions at Loop 1604 for beam installation work. 
SH 46 – Kendall County
  • Sunday, December 9 until Thursday, December 13. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions from Herff Road to Ammenn Road for barrier placement work.