I-10 – Boerne
- Monday, October 30 until Wednesday, November 1. 8 p.m. until 6 a.m. nightly. Westbound main lanes at Exit 540. The right lane will close while crews resurface the road. This closure includes the exit to Hwy 46. Traffic will exit Business 87 (Exit 542) to reach its destination.
I-10 – Fair Oaks Ranch
- Tuesday, October 31, at 9 a.m. until Friday, December 29. Westbound frontage road at Old Fredericksburg Road. All lanes will close while crews replace drain structures. Traffic will follow the signed detour route, including a temporary route under the new overpass at Old Fredericksburg, to reach its destination.
I-10 – Leon Springs
- Saturday, October 28. 7 a.m. until 5 p.m. Westbound main lanes between Dominion Drive and Boerne Stage Road. The right lane will close while crews set barrier.
- Sunday, October 29 until Wednesday, November 1. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Ralph Fair Road and La Cantera Parkway. The left lane will close while crews set barrier.
- Sunday, October 29 until Friday, November 3. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Ralph Fair Road and La Cantera Parkway. Alternating lanes will close while crews set barrier.
- Sunday-Tuesday, November 5-7. 9 p.m. until 5 a.m. nightly. Westbound main lanes between Ralph Fair Road and La Cantera Parkway. Alternating lanes will close while crews restripe the road.
I-10 – Northwest San Antonio
- Monday, October 30 until Friday, November 3. 9 a.m. until 3 p.m. daily. Eastbound frontage road between West Hollywood and Fredericksburg Road. The right lane will close while crews do concrete work.
I-35 – Schertz
- Current until October 2018. Frontage roads, both directions, at FM 1103. The right lane will close while crews replace the FM 1103 overpass bridge.
I-35 – East San Antonio
- Current until Monday, November 6. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between George Beach and Thousand Oaks. Alternating lanes will close while crews lay asphalt.
- Sunday, October 29 until Friday, November 3. 8 p.m. until 5 a.m. nightly. Northbound main lanes between Broadway and I-410. Alternating lanes will close while crews clean bridge joints.
I-37 – Downtown San Antonio
- Current and continuous until Friday, December 1 at 5 p.m. Northbound exit ramp to Florida and Carolina avenues (exit 140A). The ramp will close while crews rebuild the slope near the exit. Traffic will exit Cesar Chavez (exit 140B) and turn around to reach its destination.
I-410 – West San Antonio
- Current until Friday, November 3. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Hwy 151 and Culebra Road. The left two lanes will close while crews work on overhead highway sign structures.
- Current until Wednesday, November 15. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Marbach and Hwy 151. Two right lanes will close while crews set barrier.
- Current until Wednesday, November 22. Northbound exit to Culebra Road. The exit will close while crews widen the main lanes and frontage road. Traffic will exit Ingram Road, turn around and get to Culebra on the southbound frontage road.
- Current until Sunday, November 26. 9 p.m. until 5 a.m. nightly. Northbound main lanes and frontage roads at US Hwy 90. The right lane will close while crews work on overhead bridge support columns. This closure includes the ramp from westbound US 90. Traffic will head south to Valley Hi and turn around to reach its destination.
- Current until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
U.S. Hwy 90 – West San Antonio
- Current until Wednesday, November 15. 9 p.m. until 5 a.m. nightly. Eastbound frontage road between Ray Ellison and I-410. All lanes will close while crews set bridge panels. Traffic will use Crooked Trail and the southbound frontage road of I-410 to reach its destination.
- Sunday-Tuesday, October 29-31. 9 p.m. until 5:30 a.m. nightly. Westbound frontage road at I-410. Alternating lanes will close while crews work on overhead lights.
- Sunday-Tuesday, October 29-31. 9 p.m. until 5:30 a.m. nightly. Westbound main lanes between Military Drive and I-410. All lanes will close while crews work on overhead highway signs. Traffic will exit I-410, follow the frontage road and re-enter at the next available ramp.
- Monday, October 30 at 8 p.m. until Tuesday, October 31 at 5 a.m. Westbound main lanes between I-410 and Hunt Lane. The right lane will close while crews set barrier.
- Monday, October 30 at 9 p.m. until Tuesday, October 31 at 5 a.m. Main lanes, both directions, at Loop 1604. All lanes will close while crews set overhead bridge support beams. Traffic will exit Loop 1604, continue through the intersection and re-enter the highway.
- Monday, October 30 until Wednesday, November 1. 8 p.m. until 5 a.m. nightly. Eastbound main lanes at I-410. All lanes will close while crews set bridge support beams overhead. Traffic will exit I-410, follow the frontage road and use the next available ramp to re-enter the highway.
- Monday, October 30 until Friday, November 3. 9 a.m. until 3:30 p.m. daily. Westbound main lanes between Acme and Herbert. The right lane will close while crews drill foundations for street lights.
U.S. Hwy 281 – Near north San Antonio
- Monday-Tuesday, October 30-31. 9 a.m. until 3 p.m. daily. Northbound exit ramp to Hildebrand. The exit will close as needed while crews work on guardrail. Crews will try to keep the ramp open as much as possible while work is done from the shoulder area.
U.S. Hwy 281 – North San Antonio
- Saturday, October 28. 8 a.m. until 8 p.m. Southbound main lanes at Sonterra Road. The right lane will close while crews set barrier.
- Saturday, October 28. 8 a.m. until 8 p.m. Southbound frontage road between Sonterra Road and Loop 1604. The left lane will close while crews set barrier.
- Monday, October 30-Friday, November 3. 9 p.m. until 5 a.m. nightly. Southbound main lanes at Sonterra Road. The right lane will close while crews set barrier.
- Wednesday-Friday, November 1-3. 9 p.m. until 5 a.m. nightly. Southbound main lanes at Sonterra Road. All lanes will close while crews remove an overhead sign board. Traffic will exit Sonterra and re-enter the main lanes at the next available ramp.
- Monday-Friday, November 6-10. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Sonterra Road and Loop 1604. Alternating lanes will close while crews restripe the road.
- Wednesday-Friday, November 8-10. 9 p.m. until 5 a.m. nightly. Southbound main lanes at Sonterra Road. All lanes will close while crews remove an overhead sign board. Traffic will exit Sonterra and re-enter the main lanes at the next available ramp.
Hwy 151 – Northwest San Antonio
- Current until December 22. Westbound exit to Hunt Lane. The exit will close while crews reconstruct the roadway to fit the future direct connector ramp from southbound I-410. Traffic will exit Ingram and follow the frontage road to reach its destination.
Loop 1604 – Northwest San Antonio
- Current until Friday, January 26, 2018. North-to-south turnaround at Bandera Road. The turnaround will remain closed while crews do road work. Traffic will use the signalized intersection to turn around.
Other roads – West San Antonio
- Friday, October 27 at 8 p.m. until Monday, October 30 at 5 a.m. Marbach Road, both directions, at I-410. All lanes will close while crews wreck overhead bridge structures. Traffic will turn right onto the frontage road, turn around at the first available intersection and return to Marbach to reach its destination.
- Current until Friday, November 17. Dodge City, both directions, at Loop 1604. All lanes will close while crews reconstruct the intersection. Traffic will use Emory Peak to reach its destination.
- Current until Friday, November 17. Red Musket, both directions, at Loop 1604. All lanes will close while crews reconstruct the intersection. Traffic will use Spurs Ranch to reach its destination.
- Monday, October 30 until Friday, November 3. 9 a.m. until 3 p.m. daily. Eastbound Potranco Road between Loop 1604 and Waterstone Place. Alternating lanes will close while crews build drain inlets.
- Monday, October 30 until Friday, November 3. 9 p.m. until 5 a.m. nightly. Potranco Road, both directions, between Loop 1604 and Waterstone Place. Traffic will be down to a single lane while crews construct drain inlets. One lane, two-way traffic will be controlled by flaggers.
- Friday, November 17 at 9 p.m. until Monday, November 20 at 6 a.m. Marbach Road, both directions, west of Loop 1604. All lanes will close while crews reconstruct the intersection. Traffic will use Emory Peak to reach its destination.
- Friday, December 1 at 9 p.m. until Monday, December 4 at 6 a.m. Marbach Road, both directions, west of Loop 1604. All lanes will close while crews reconstruct the intersection. Traffic will use Emory Peak to reach its destination.
Other roads – Northwest San Antonio
- Monday, October 30. 9 a.m. until 4 p.m. daily. FM 1560, both directions, between Shaenfield Road and Braun Road. Alternating lanes will close while crews repair the roadway. Traffic will be controlled by flaggers.
All closures are pending weather.