Friday, July 16

UPCOMING SCHEDULED CONSTRUCTION CLOSURES



Loop 1604 – North Central San Antonio/Bexar County

  • Current until Friday, July 23. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from Stone Oak Parkway to Blanco Rd. for utility work.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, July 19 until Friday, July 23.  Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, July 19 until Friday, July 23. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Friday, July 30. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound to eastbound turnaround lanes at SH 16 (Bandera Rd.) and closure of one left turn lane from SH 16 (Bandera Rd.) southbound to Loop 1604 eastbound frontage road for placement of abutments and drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Friday, July 30. Weeknights 9 p.m. until 5 a.m. Single lane closure on the eastbound to westbound turnaround lanes at SH 16 (Bandera Rd.) and closure of one left turn lane from SH 16 (Bandera Rd.) northbound to Loop 1604 westbound frontage road for placement of abutments and drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Friday, July 30. Weekdays 9 a.m. until 3 p.m. Single lane closure on the eastbound frontage road right turn lane to W. Hausman Rd. for underground utility work. DETOURS: Traffic will continue on the Loop 1604 eastbound frontage road through the W. Hausman Rd. intersection to the Kyle Seale Pkwy. turnaround.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from Babcock Rd. to W. Hausman Rd. for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from W. Hausman Rd. to SH 16 (Bandera Rd.) for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the eastbound mainlanes from SH 16 (Bandera Rd.) to Babcock Rd. for barrier setting and work on drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Monday, July 19 until Friday, July 30. Weekdays 9 a.m. to 3 p.m. Single lane closure on the eastbound to westbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Monday, July 19 until Friday, July 30. Weekdays 9 a.m. to 3 p.m. Single lane closure on the westbound to eastbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Monday, July 19 until Friday, July 30. Weeknights 9 p.m. to 5 a.m. Single lane closure on the eastbound to westbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Monday, July 19 until Friday, July 30. Weeknights 9 p.m. to 5 a.m. Single lane closure on the westbound to eastbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd. 

US 281 – North Central San Antonio/Bexar County

  • Monday, July 19 until Tuesday, July 20. 9 p.m. to 5 a.m. Alternating lane closures on Marshall Rd. at US 281 for striping operations.
  • Monday, July 19 until Thursday, July 22. 9 p.m. to 5 a.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, July 19 until Friday, July 23. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, July 19 until Friday, July 23.  Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, July 17 6 a.m. until Monday, July 19. 5 a.m. Eastbound mainlanes reduced to one lane from Woodlake Parkway to FM 1516 for repairs. Exit ramp to FM 1516 will also be closed. DETOUR: Traffic to FM 1516 will exit Woodlake Parkway.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, July 25 8 p.m. until Monday, July 26 5 a.m. Southbound mainlanes closed on the lower level in Downtown San Antonio. All traffic will be directed to upper level mainlanes and must exit at Martin St. The left lane of the upper level mainlanes will also be closed. These closures will allow for bridge repairs.
  • Current until Saturday, July 17. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, at Conrad Rd. for bent cap construction.
  • Current until Saturday, July 17. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, July 17. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Current until Saturday, July 17. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Monday, July 19 until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, July 19 until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, July 19 until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Sunday, July 18 until Friday, July 23. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to FM 2252 for barrier movement.
  • Sunday, July 18 until Friday, July 23. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 for barrier movement.
  • Sunday, July 18 until Wednesday, July 21. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from Loop 1604 to Walnut Ave. for overhead sign replacements. 

I-410 – West San Antonio

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Harrow Dr. to Oak for sidewalk improvements.
  • Sunday, July 18 until Monday, July 26. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, July 18 until Monday, July 26. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, July 18 until Monday, July 26. 8 p.m. to 5 a.m. Single northbound mainlane closure from Military Dr. to Culebra Rd. for bridge work.
  • Sunday, July 18 until Monday, July 26. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Military Dr. to Marbach Rd. for bridge work.
  • Sunday, July 18 until Monday, July 26. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 

I-410 – Central/North East San Antonio

  • Wednesday, July 21 until Friday, July 23. 9 p.m. to 5 a.m. Various mainlane closures from I-35 to I-10 for overhead sign replacements. 

SH 151 – West San Antonio

  • Sunday, July 18 until Monday, July 26. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Sunday, July 18 until Monday, July 26. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

Alamo Ranch Parkway – Bexar County

  • Friday, July 16 – 10 p.m. to Monday, July 19 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge deck panels. 

SH 211 – Bexar County

  • Monday, July 19. 8 a.m. to 6 p.m. Full closure of intersection at FM 1957 for roadway replacement.
  • Thursday, July 22. 8 a.m. to 6 p.m. Single lane closure, in both directions, from Briggs Ranch to US 90 for roadway repairs. 

US 90 – Bexar County

  • Tuesday, July 20. 8 a.m. to 6 p.m. Several closures at SH 211 for roadway repairs including: westbound exit to SH 211, first crossover bridge west of SH 211, and eastbound left lane at the second crossover bridge west of SH 211.  
  • Wednesday, July 21. 8 a.m. to 6 p.m. Eastbound exit to SH 211 closed for roadway repairs. 

SL 13 – Military Dr.

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single lane closures, in both directions, from New Laredo Highway to Somerset Rd. for sidewalk improvements. 

FM 1535 – N.W. Military Highway

  • Current until Saturday, July 16. Single lane closure, in both directions, from Loop 1604 to Huebner Rd. for right of way preparation.
  • Monday, July 19 until Friday, July 23. 9 a.m. to 5 p.m. Double lane closures, in, both directions, from Loop 1604 to Huebner Rd. for right of way preparation.   

FM 2252 – Bexar County

  • Thursday, August 5 until Friday, August 6. 7 p.m. to 7 a.m. Full closure of intersection at Evans Rd. for installation of bridge beams. DETOUR: Traffic will be directed to use FM 3009 to access I-35, Evans Rd. of Lookout Rd.

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 345 – Fredericksburg Rd.

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-35 – Medina County

  • Monday, July 19 until Monday, August 9. 7 a.m. to 9 p.m. Single southbound mainlane closure from SH 173 to Francisco Perez Creek for bridge repairs.  

Work Continues on I-10 Kendall Extension Project with Changes Coming to I-10 WB Frontage Road & Scenic Loop Rd.



As part of the ongoing IH 10 frontage road construction in Kendall County, the contractor is progressing into the next stage of construction which will require reconstructing the IH 10 Westbound Frontage Road near Scenic Loop and Cascade Caverns.

The existing outside lane of the westbound frontage road at Scenic Loop will be closed for reconstruction, and traffic will be transferred onto the newly constructed inside lane to maintain frontage road operations.

Traffic will remain as a single lane from Scenic Loop to the new US-87 exit ramp (Exit 542). Additionally, Cascade Caverns will be closed for reconstruction between the westbound frontage road and Old San Antonio Road. Traffic will be detoured to Scenic Loop to access the IH-10 Westbound Frontage Road.

This work is scheduled to start beginning Monday, July 19, 2021 – weather permitting.

Once complete, this construction will allow TxDOT’s contractor to complete the westbound frontage road widening from Scenic Loop to US-87 (Main Street). This segment’s estimated completion is Summer 2021.


Friday, July 9

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Current until Friday, July 23. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from Stone Oak Parkway to Blanco Rd. for utility work.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, July 12 until Friday, July 16. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, July 12 until Friday, July 16. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Tuesday, July 13. 9 a.m. to 2 p.m. Westbound right shoulder closure from Huebner Rd. to Bitters Rd. for inspection.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – South San Antonio/Bexar County

  • Monday, July 12. 8 a.m. to 6 p.m. Single lane closure, in both directions, from Curran Rd. to Morin Rd. for roadway improvements.
  • Thursday, July 15. 8 a.m. to 6 p.m. Single lane closure, in both directions, from I-35 to FM 2536, for roadway improvements. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from W. Hausman Rd. to SH 16 (Bandera Rd.) including the entrance ramp from W. Hausman Rd. and the exit ramp to SH 16 (Bandera Rd.) for barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the SH 16 (Bandera Rd.) intersection and the exit before Kyle Seale Pkwy.
  • Current until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from Babcock Rd. to W. Hausman Rd. including the entrance ramp from Babcock Rd. and the exit ramp to Kyle Seale Pkwy. for restriping and barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the W. Hausman Rd. intersection and the exit before Babcock Rd.
  • Current until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from I-10 to La Cantera/Chase Hill Blvd. including the exit ramp to La Cantera/Chase Hill Blvd. and the entrance ramp from I-10 for barrier setting. DETOURS: Traffic will be directed to the exit ramp before La Cantera/Chase Hill Blvd. at 1604 frontage road exit, and the for the I-10 entrance ramp closure will continue straight through La Cantera/Chase Hill Blvd. to next on ramp.
  • Current until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from W. Hausman Rd. to Babcock Rd. including the entrance ramp from Kyle Seale Pkwy. and the exit ramp to Babcock Rd. for barrier setting. DETOURS: Traffic will be directed to the entrance ramp after the Babcock Rd. intersection and the exit ramp before W. Hausman Rd.
  • Current until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from Babcock Rd. to I-10 including the exit ramp to La Cantera/Chase Hill Blvd. for barrier setting. DETOURS: Traffic will be directed to the exit ramp before Babcock Rd.
  • Monday, July 12. 9 p.m. to 5 a.m. Single northbound mainlane closure, including left lane on frontage road, at Braun Rd. for barrier setting.
  • Monday, July 12 – 9 a.m. to Friday, July 16 – 3 p.m. Single lane closure on the eastbound frontage road right turn lane to W. Hausman Rd. for underground utility work. DETOURS: Traffic will continue on the Loop 1604 eastbound frontage road through the W. Hausman Rd. intersection to the Kyle Seale Pkwy. turnaround.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from Babcock Rd. to W. Hausman Rd. for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from W. Hausman Rd. to SH 16 (Bandera Rd.) for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Sunday, July 18 until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the eastbound mainlanes from SH 16 (Bandera Rd.) to Babcock Rd. for barrier setting and work on drill shafts. DETOURS: No detours required; one lane to remain open at all times. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, July 10. 7 a.m. to 5 p.m. Single southbound lane closure from Overlook Parkway to Wilderness Oak for sidewalk improvements.
  • Saturday, July 10. 7 a.m. to 5 p.m. Single northbound lane closure from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Sunday, July 11. 7 a.m. to 4 p.m. Full closure of mainlanes, in both directions, at St. Mary’s St. for transferring of utility lines. Traffic will be stopped multiple times for 15 minute intervals.
  • Sunday, July 11 until Wednesday, July 14. Nightly 9 p.m. to 5 a.m. Various mainlane closures from I-35 to Basse Rd. for overhead sign replacement.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, July 12 until Saturday, July 16. 9 p.m. to 5 a.m. Single southbound lane closure at Overlook Parkway for sidewalk improvements.
  • Monday, July 12 until Saturday, July 16. 9 p.m. to 5 a.m. Single northbound lane closure at Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Monday, July 12 until Saturday, July 16. 9 p.m. to 5 a.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Monday, July 12 until Friday, July 16. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, July 12 until Friday, July 16. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, July 12 until Friday, July 16. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, July 12 until Friday, July 16. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 17 until Sunday, July 18. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 and FM 1103 for material haul-off.
  • Current until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Current until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for curb demolition.
  • Monday, July 12 until Saturday, July 17. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, at Conrad Rd. for bent cap construction.
  • Monday, July 12 until Saturday, July 17. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, July 12 until Saturday, July 17. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, July 12 until Saturday, July 17. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Wednesday, July 14 until Thursday, July 15. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to FM 2252 for barrier movement.
  • Wednesday, July 14 until Friday, July 16. 9 p.m. to 5 a.m. Various mainlane closures from Loop 1604 to Walnut Ave. for overhead sign replacements.
  • Friday, July 16. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, at Parkway for retaining wall work. 

I-410 – West San Antonio

  • Current until Monday, July 12. Nightly 8 p.m. to 5 a.m. Full closure of mainlanes in both directions from W. Military Dr. to Marbach Rd. for bridge work. Traffic will be detoured to the frontage road.
  • Current until Saturday, July 10. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Saturday, July 10. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Northbound exit ramp to Culebra Rd. closed for bridge work. Traffic will be directed to next exit ramp.
  • Current until Monday, July 12. Daily 9 a.m. to 3 p.m. Southbound to northbound turnaround closed at SH 151 for bridge work.
  • Monday, July 12 until Friday, July 30. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Harrow Dr. to Oak for sidewalk improvements. 

SH 151 – West San Antonio

  • Current until Sunday, July 11. Nightly 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work. 

Alamo Ranch Parkway – Bexar County

  • Friday, July 9 – 10 p.m. to Monday, July 12 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge deck panels.
  • Friday, July 16 – 10 p.m. to Monday, July 19 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge deck panels. 

SL 13 – Military Dr.

  • Monday, July 12 until Friday, July 30. 8 a.m. to 4 p.m. Single lane closures, in both directions, from New Laredo Highway to Somerset Rd. for sidewalk improvements. 

FM 1535 – N.W. Military Highway

  • Monday, July 12 until Saturday, July 16. Single lane closure, in both directions, from Loop 1604 to Huebner Rd. for right of way preparation. 

FM 2252 – Bexar County

  • Tuesday, July 20 until Wednesday, July 21. 7 p.m. to 7 a.m. Full closure of intersection at Evans Rd. for installation of bridge beams. DETOUR: Traffic will be directed to use FM 3009 to access I-35, Evans Rd. of Lookout Rd. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.  

FM 345 – Fredericksburg Rd.

  • Monday, July 12 until Friday, July 30. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-10 – Kendall County/Kerr County

  • Monday, July 12 until Friday, July 16. 7:30 a.m. to 5:30 p.m. Single mainlane closures, in both directions, from Frederick’s Creek Bridge to Johns Rd. for mow strip work.
  • Monday, July 12 until Friday, July 16. 7 a.m. to 6:30 p.m. Single eastbound mainlane closures from Unnamed Draw to North Creek for base repairs. 

I-37 – Atascosa County

  • Monday, July 12 until Thursday, July 15. Single northbound mainlane closure at the Atascosa River bridge for bridge work.

 


Friday, July 2

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North San Antonio/Bexar County

  • Monday, July 5 until Friday, July 9. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, July 5 until Friday, July 9. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Current until Friday, July 23. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from Stone Oak Parkway to Blanco Rd. for utility work. 

Loop 1604 – South San Antonio/Bexar County

  • Current until Friday, July 9. Daily 8 a.m. to 6 p.m. Single lane closure, in both directions, from Curran Rd. to Morin Rd. for roadway improvements. 

Loop 1604 – North West San Antonio/Bexar County

  • Monday, July 5 until Friday, July 9. Single northbound mainlane and single northbound frontage road closure at Braun Rd. for barrier setting.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from W. Hausman Rd. to SH 16 (Bandera Rd.) including the entrance ramp from W. Hausman Rd. and the exit ramp to SH 16 (Bandera Rd.) for barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the SH 16 (Bandera Rd.) intersection and the exit before Kyle Seale Pkwy.
  •  Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from Babcock Rd. to W. Hausman Rd. including the entrance ramp from Babcock Rd. and the exit ramp to Kyle Seale Pkwy. for restriping and barrier setting. DETOURS: Traffic will be directed to use the entrance ramp after the W. Hausman Rd. intersection and the exit before Babcock Rd.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closures from I-10 to La Cantera/Chase Hill Blvd. including the exit ramp to La Cantera/Chase Hill Blvd. and the entrance ramp from I-10 for barrier setting. DETOURS: Traffic will be directed to the exit ramp before La Cantera/Chase Hill Blvd. at 1604 frontage road exit, and the for the I-10 entrance ramp closure will continue straight through La Cantera/Chase Hill Blvd. to next on ramp.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from W. Hausman Rd. to Babcock Rd. including the entrance ramp from Kyle Seale Pkwy. and the exit ramp to Babcock Rd. for barrier setting. DETOURS: Traffic will be directed to the entrance ramp after the Babcock Rd. intersection and the exit ramp before W. Hausman Rd.
  • Monday, July 5 until Friday, July 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closures from Babcock Rd. to I-10 including the exit ramp to La Cantera/Chase Hill Blvd. for barrier setting. DETOURS: Traffic will be directed to the exit ramp before Babcock Rd.
  • Sunday, July 11 until Friday, July 16. Nightly 9 p.m. to 5 a.m. Single lane closure on westbound to eastbound turnaround at SH 16 (Bandera Rd.) 
  • Sunday, July 11 until Friday, July 16. Nightly 9 p.m. to 5 a.m. Single left turn closure from SH 16 (Bandera Rd.) to the eastbound frontage road.
  • Sunday, July 11 until Friday, July 16. Nightly 9 p.m. to 5 a.m. Single lane closure on eastbound to westbound turnaround at SH 16 (Bandera Rd.) 
  • Sunday, July 11 until Friday, July 16. Nightly 9 p.m. to 5 a.m. Single left turn lane closure from SH 16 (Bandera Rd.) to the westbound frontage road. 
  • Monday, July 12 – 9 a.m. to Friday, July 16 – 3 p.m. Single lane closure on the eastbound frontage road right turn lane to W. Hausman Rd. for underground utility work. DETOURS: Traffic will continue on the Loop 1604 eastbound frontage road through the W. Hausman Rd. intersection to the Kyle Seale Pkwy. turnaround. 

US 281 – North Central San Antonio/Bexar County

  • Monday, July 5 until Friday, July 9. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, July 5 until Friday, July 9. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 10 until Sunday, July 11. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  •  Monday, July 5 until Friday, July 9. Nightly 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Tuesday, July 6 until Friday, July 9. 9 p.m. to 5 a.m. Single lane closure on southbound frontage road from Overlook Parkway to Wilderness Oak for sidewalk improvements.
  • Tuesday, July 6 until Friday, July 9. Nightly 9 p.m. to 5 a.m. Various mainlane closures from I-35 to Basse Rd. for overhead sign replacement.
  • Sunday, July 11. 7 a.m. to 4 p.m. Full closure of mainlanes, in both directions, at St. Mary’s St. for transferring of utility lines. Traffic will be stopped multiple times for 15 minute intervals.
  • Tuesday, July 6. 9 p.m. to 5 p.m. Left turn lane on southbound frontage road closed at Bitters Rd., including the right turn lane on eastbound Bitters Rd., for utility work. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until Monday, July 5. Eastbound entrance ramp from FM 1518 closed for roadway improvements.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 3. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, July 3. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Tuesday, July 6 until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 and FM 1103 for material haul-off.
  • Tuesday, July 6 until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Tuesday, July 6 until Saturday, July 10. Daily 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1103 to Schwab Rd. for curb demolition. 

I-410 – West San Antonio

  • Monday, June 28 until Saturday, July 3. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Single northbound mainlane closure from W. Military Dr. to Culebra Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, June 27 until Saturday, July 3. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, July 5 until Monday, July 12. Nightly 8 p.m. to 5 a.m. Full closure of mainlanes in both directions from W. Military Dr. to Marbach Rd. for bridge work. Traffic will be detoured to the frontage road.
  • Monday, July 5 until Saturday, July 10. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Monday, July 5 until Saturday, July 10. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, July 5 until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, July 5 until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Northbound exit ramp to Culebra Rd. closed for bridge work. Traffic will be directed to next exit ramp. 

SH 151 – West San Antonio

  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Sunday, June 27 until Saturday, July 3. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, July 5 until Sunday, July 11. Nightly 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, July 5 until Saturday, July 10. Nightly 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work. 

Alamo Ranch Parkway – Bexar County

  • Friday, July 9 – 10 p.m. to Monday, July 12 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge deck panels.
  • Friday, July 16 – 10 p.m. to Monday, July 19 5 a.m. Full closure of the Westwood Loop intersection for placement of bridge deck panels.

FM 1535 – N.W. Military Highway

  • Tuesday, July 6 until Friday, July 9. Daily 9 a.m. to 5 p.m. Single right lane closure, in both directions, from Loop 1604 to Huebner Rd. for right of way preparation. 

PA 1502 – Wurzbach Parkway

  • Thursday, July 8. 9 a.m. to 4 p.m. Single westbound right turn lane closed at N.W. Military Hwy. for saw cutting. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until Tuesday, July 29. 7 p.m. to 7 a.m. Alternating lane closures, in both directions, from Walzem Rd. to Loop 1604 for paving operations.
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-37 – Atascosa County

  • Monday, July 12 until Thursday, July 15. Single northbound mainlane closure at the Atascosa River bridge for bridge work.